MDC Upgrade
Installation
Task
Plane 1
Plane 2
Plane 3/4 Sector 1
Plane 3/4 Sector 2
Plane 3/4 Sector 3
Plane 3/4 Sector 4
Plane 3/4 Sector 5
Plane 3/4 Sector 6
Chamber equipped optical connector
2009-10-14
2009-11-02
2009-11-02
MDC Optical AddOn connected
2009-09
MDC Optical AddOn mounting
Low Voltage Cable from switchbox to chamber
2009-09
2009-09
2009-09
2009-09
2009-09
2009-09
Optical Fibres in mainframe
2009-09
2009-09
2009-09
2009-09
2009-09
2009-09
Optical cables cut
long sides
2009-10-29
2009-10-09
2009-10-12
2009-10-12
2009-10-09
Power cables cut
long sides
2009-10-12
2009-10-12
2009-10-12
2009-10-12
2009-10-09
Power cables tested
long sides
2009-10-12
2009-10-12
2009-09
2009-10-12
2009-10-12
Optical Fibres - cut ends to addon properly
2009-10-07
2009-10-12
2009-11-03
2009-09
2009-10-09
2009-10-07
Optical Fibres - cut ends in mainframe properly
2009-12-11
2009-11-04
2009-11-03
2009-09
2009-10-09
2009-10-07
Optical Fibres - numbering addon side
2009-12-11
2009-11-04
2009-11-03
2009-09
2009-10-09
2009-10-07
Optical Fibres - numbering mainframe side
2009-12-11
2009-11-04
2009-11-03
2009-09-25
2009-10-09
2009-10-07
Low Voltage Connectors
in mainframe
2009-12
2009-12
2009-09
one side
2009-10-15
Optical Fibres - connector in mainframe
2009-12
2009-12
2009-12
2009-10-14
2009-12
2009-11-02
Chamber equipped with OEPs
2009-12-20
2009-12
2009-12
2009-10-12
2009-10-30
2009-10-14
Replaced CMS connectors
2009-12
2009-12-10
2009-12-11
2009-12-12
2009-12-13
2009-12-14
Chamber equipped with optical fibres
long sides
two sides
two sides
2009-09
2009-10-30
2009-10-14
Chamber equipped with power cables
long sides
two sides
two sides
2009-09
2009-10-30
2009-10-14
Chamber equipped with trigger cables
long sides
two sides
two sides
2009-09
2009-10-30
2009-10-14
Red:
Planned time
Brown:
temporarily done
Green:
finished
FanPW
voltage adjustment
Sector
Module
Date
0
0
0
1
0
2
0
3
1
0
1
1
1
2
1
3
2
0
2
1
2
2
2
3
3
0
3
1
2010-05-05
3
2
3
3
4
0
4
1
4
2
4
3
5
0
5
1
5
2
5
3
TRB / AddOn
The stacks for TRB / MDC AddOn are built
Holding for stacks will be prepared by Andreas until 15.01.
Current Numbers
Item
Produced
Tested
Installed
Date
OEP v3 series 1
20
19
0
2009-10-05
OEP v3 series 2
40
25
0
2009-10-09
OEP v3 series 2
81
73
50
2009-10-12
OEP v3 series 2
116
94
82
2009-10-14
OEP v3 series 2
128
112
82
2009-10-15
OEP v3 series 2
193
112
82
2009-10-19
OEP v3 series 2
213
112
82
2009-10-20
OEP v3 series 2
216
182
82
2009-10-23
OEP v3 series 2
216
216
82
2009-10-28
OEP v3 series 2
228
216
102
2009-10-29
OEP v3 series 2
310
216
102
2009-11-02
OEP v3 series 2
338
216
114
2009-11-03
OEP v3 series 2
328
282
124
2009-11-04
OEP v3 series 2
406
286
124
2009-11-05
OEP v3 series 2
440
440
~250
2009-12-01
MDC Optical AddOn v1
5
5
1
2009-10-05
MDC Optical AddOn v2
16
16
12
2010-02-01
Fan PW v2
3
3
1
2009-10-07
Fan PW v3
4
4
--
2009-12-10
Fan PW v3
30
30
--
2010-01-10
This topic: DaqSlowControl
>
DaqUpgrade
>
DaqUpgradeMDCOverview
>
MDCUpgradeInstallation
>
InstallationTimeTable
Topic revision:
2010-05-05,
JoernWuestenfeld
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki
Send feedback
|
Imprint
|
Privacy Policy (in German)