Logbook
Installation: INNER planes
Task
Plane 1/2 Sector 1
Plane 1/2 Sector 2
Plane 1/2 Sector 3
Plane 1/2 Sector 4
Plane 1/2 Sector 5
Plane 1/2 Sector 6
Threshold test
Calibration test
Check Low Voltage Connectors on FANPV
Check Low Voltage Connectors on OEPB
Check connections between OEPB and MB
Installation: OUTER planes
Task
Plane 3/4 Sector 1
Plane 3/4 Sector 2
Plane 3/4 Sector 3
Plane 3/4 Sector 4
Plane 3/4 Sector 5
Plane 3/4 Sector 6
Threshold test
14-18 Feb
Calibration test
14-18 Feb
Check Low Voltage Connectors on FANPV
Check Low Voltage Connectors on OEPB
Check connections between OEPB and MB
Empty space: not yet done;
Brown:
temporarily done;
Green:
finished
--
AttilioTarantola
- 04 Feb 2011
This topic: DaqSlowControl
>
DaqUpgrade
>
DaqUpgradeMDCOverview
>
WorkLogBook
Topic revision:
2011-02-11,
AttilioTarantola
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki
Send feedback
|
Imprint
|
Privacy Policy (in German)