DAQ Upgrade - Installation of TRB, AddOn, Network...

Trigger Distribution

  • RPC: One PECL->LVDS converter on each sector
  • Shower: Same distributor board as RPC
  • TOF: One PECL->LVDS distributor on each sector
  • MDC 3/4: Same as TOF distributor
  • MDC 1/2: One PECL->LVDS distributor on two sectors. Then LVDS connection to FanPW on each sector
  • RICH: own trigger distribution, four LVDS lines from CTS, own LVDS->LVDS distributor board
  • Start, Veto: Connected to TOF-Distributor to have the same jitter on Start and TOF
  • Wall: One PECL-> LVDS distributor

Total: 6 RPC/Shower, 2 MDC12, 6 TOF/MDC34, 1 Wall -> 15 PECL-LVDS-Boards needed;

TrbNet Hubs

DetectorHubsSetupPosition
MDC34 1 no Gbe front right corner of mainframe
MDC12 1 no Gbe under right platform, next to MDC power supplies
RPC 2 no Gbe rear right corner of mainframe
TOF 1 no Gbe front right corner of mainframe
Shower 1 no Gbe rear right corner of mainframe
RICH 3 Gbe under right platform, next to MDC power supplies
CTS / Others 1 maybe Gbe in old trigger rack

Total: 10 TRB-Hub2 boards

TRBs

DetectorAmountConfiguration
RPC 24 with TDC
TOF 7 with TDC
Shower 0 AddOn on RPC-TRB
MDC 0 New MDC Concentratos is a stand-alone board
RICH 0  
Hubs 10 power supply & Etrax only
CTS 2 One board CTS, one for slow control
Forward Wall 3 with TDC
Start/Veto 1 with TDC

Network Switches

NameDetectorDatarateDownlinksSorted ascendingUplinksPosition
HADSW07 Foward Wall 30 1x FW GbE, 4x TRB 01C-08  
HADSW08 Shower 5,6 100 2x Shower 05Q-20 table, rear right corner
HADSW09 Shower 2,3 100 2x Shower 05Q-19 table, rear right corner
HADSW03 MDC12 1,2,3 60 3x MDC 01C-06 under right platform, 12/12port switch
HADSW04 MDC12 4,5,6 60 3x MDC 01C-03 under right platform, 12/12port switch
HADSW05 MDC34 2,3,4, TOF 1-4 60 3x MDC, 4x TOF 1-4 1 front right corner, new 16/4port switch
HADSW06 MDC34 1,5,6 TOF 5-X 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
--- RICH 100 3x RICH GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
Switch 9 RICH 0 4x Rich / MDC12 SCtrl via Switch 7 RICH TRB stack
Switch 10 - 15 RPC / Shower 0 4x RPC TRB, 1x Hadcon via HADSW01/02 on each sector
HADSW01 Shower & RPC 1,2,3 45 6x Shower, 1x RPC 05P-18 rear right corner, new 16/4port switch
HADSW02 Shower & RPC 4,5,6 45 6x Shower, 1x RPC 05P-17 rear right corner, new 16/4port switch
Switch 7 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
Switch 8 CTS 5 CTS, other boards on CTS stack 1 on CTS stack

Port Usage

HADSW01 (RPC/Shower 1,2,3) (192.168.100.29)

  • Port 1: RPC/Shower sector 1
  • Port 2: RPC/Shower sector 2
  • Port 3: RPC/Shower sector 3
  • Port 9: RPC Hub sector 1,2,3
  • Port 12: Uplink, port on wall 05P-18
  • Port A: Shower sector 1
  • Port B: Shower sector 2 (moved to HADSW09)
  • Port C: Shower sector 3 (moved to HADSW09)

HADSW02 (RPC/Shower 4,5,6) (192.168.100.30)

  • Port 1: RPC/Shower sector 4
  • Port 2: RPC/Shower sector 5
  • Port 3: RPC/Shower sector 6
  • Port 9: RPC Hub sector 4,5,6
  • Port 10: Shower Hub
  • Port 12: Uplink, port on wall 05P-17
  • Port A: Shower sector 4
  • Port B: Shower sector 5 (moved to HADSW08)
  • Port C: Shower sector 6 (moved to HADSW08)

HADSW03 (MDC 1/2 1,2,3)

  • Port 1: MDC1/2 sector 1
  • Port 2: MDC1/2 sector 2
  • Port 3: MDC1/2 sector 3
  • Port 12: Uplink, port 6 on patch panel, 01C-06

HADSW04 (MDC 1/2 4,5,6)

  • Port 1: MDC1/2 sector 4
  • Port 2: MDC1/2 sector 5
  • Port 3: MDC1/2 sector 6
  • Port 12: Uplink, port 3 on patch panel, 01C-03

HADSW05 (MDC 3/4 1,2,3)

  • Port A: MDC1/2 sector 1
  • Port B: MDC1/2 sector 2
  • Port C: MDC1/2 sector 3
  • Port 1: TOF 1
  • Port 2: TOF 2
  • Port 3: TOF 3
  • Port 4: TOF 4
  • Port 8: Mainframe left side
  • Port 9: TOF Hub
  • Port 10: MDC 3/4 Hub
  • Port 12: Uplink, 05Q-18

HADSW06 (MDC 3/4 4,5,6)

  • Port A: MDC1/2 sector 4
  • Port B: MDC1/2 sector 5
  • Port C: MDC1/2 sector 6
  • Port 1: TOF 5
  • Port 2: TOF 6
  • Port 3: TOF X (extra board)
  • Port 12: Uplink, 05Q-16

HADSW07 (Forward Wall)

  • Port A: Forward Wall Hub
  • Port 1: Forward Wall TRB 1
  • Port 2: Forward Wall TRB 2
  • Port 3: Forward Wall TRB 3
  • Port 5: Hub TRB
  • Port 8: High Voltage 1
  • Port 9: High Voltage 2 haepc06 (expert power control)
  • Port 12: Uplink, 01C-08

HADSW08 (Shower 5,6) (192.168.100.24)

  • Port A: Shower 5
  • Port B: Shower 6

HADSW09 (Shower 2,3) (192.168.100.23)

  • Port A: Shower 2
  • Port B: Shower 3

Switch 7 (Power Supplies)

  • Ports 1 - 11: power supplies
  • Port 12: MDC1/2, RICH slow control
  • Port 24: Uplink, port 1 on patch panel via white switch

TrbNet Hubs

Physical connections. Ports 5 to 16 are mapped to Port 1 to 12 internally.

Central Hub

  • Port 20: CTS
  • Port 18: SCS
  • Port 5: RPC sec. 1 2 3
  • Port 6: RPC sec. 4 5 6
  • Port 7: MDC 1/2
  • Port 8: MDC 3/4
  • Port 9: Forward Wall
  • Port 10: TOF
  • Port 11: Shower
  • Port 12: RICH 1/2
  • Port 13: RICH 3/4
  • Port 14: RICH 5/6

RICH 1,2

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 9: RICH sector 1, segments 0 - 4
  • Port 10 - 14: RICH sector 2, segments 0 - 4

RICH 3,4

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 9: RICH sector 3, segments 0 - 4
  • Port 10 - 14: RICH sector 4, segments 0 - 4

RICH 5,6

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 9: RICH sector 5, segments 0 - 4
  • Port 10 - 14: RICH sector 6, segments 0 - 4

MDC 1,2

  • Port 20: Uplink
  • Port 5 - 10: MDC plane 1/2, sectors 1 to 6

MDC 3,4

  • Port 20: Uplink
  • Port 5 - 10: MDC plane 3/4, sectors 1 to 6

TOF

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 10: TOF sectors 1 to 6
  • Port 11: TOF extra board

RPC 1,2,3

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 8: RPC sector 1, segments 0 - 3
  • Port 9 - 12: RPC sector 2, segments 0 - 3
  • Port 13 - 16: RPC sector 3, segments 0 - 3

RPC 4,5,6

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 8: RPC sector 4, segments 0 - 3
  • Port 9 - 12: RPC sector 5, segments 0 - 3
  • Port 13 - 16: RPC sector 6, segments 0 - 3

Shower

  • Port 20: Uplink
  • Port 5: Shower sector 6
  • Port 6: Shower sector 5
  • Port 7: Shower sector 4
  • Port 8: Shower sector 3
  • Port 9: Shower sector 2
  • Port 10: Shower sector 1

Forward Wall

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 7: Forward Wall TRB 1 - 3

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.

  • Behind RPC detector for each sector (height: 6 6 6 12 12)
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
    • Lvl2 : TRB RPC part3
    • Lvl3 : TRB RPC part2
    • Lvl4 : TRB RPC part1, Shower AddOn
    • Lvl5 : TRB RPC part0, Baseline restorer
  • Rear right corner of mainframe (height: 6 6 6 6)
    • Lvl1 : 48V distributor
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

    • Optical switches (6x Shower, 6x ethernet switch, 3x Hub slow control, 2x uplink)
  • Front left corner of mainframe (height: 6 6 6 6)
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
    • Lvl1.0 : 48V distribution
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

    • Lvl2.1 : Ethernet switch, trigger distributor (TOF)
    • Lvl2.2 : MDC3/4 Hub
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4
  • Beside right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : MDCAddOn sector 1
    • Lvl1.2 : MDCAddOn sector 5
    • Lvl1.3 : MDCAddOn sector 6
    • Lvl1.4 : MDC Hub

    • Lvl2.1 : MDCAddOn sector 2
    • Lvl2.2 : MDCAddOn sector 3
    • Lvl2.3 : MDCAddOn sector 4
    • Lvl2.4 : MDC1/2 Hub

    • Lvl3.1 : Ethernet switch, 48V distribution
    • Lvl3.2 : RICH hub sector 1,2
    • Lvl3.3 : RICH hub sector 3,4
    • Lvl3.4 : RICH hub sector 5,6

    • Optical switch for MDC1/2
    • Media Converters for RICH
  • CTS/Start/Veto (height: 6 12 12 12)
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
    • Lvl2 : Central hub with slow control TRB
    • Lvl3 : CTS board
    • Lvl4 : Start/Veto TRB
  • On each TOF sector (height: 12), 7 stacks in total

48V power supply

In total 5 48V power supplies will be used:

  • 2 for RPC (in old Shower rack)
  • 1 for RICH frontends (in MDC LV rack)
  • 1 for RPC, FW & Shower TRBs incl. hubs (in old Shower rack)
  • 1 for all other TRBs (in MDC LV rack)

All 3 RPC/Shower power supplies can be installed in a rack next to the rear part. The other 2 in the rack with MDC power supplies.

DetectorCurrent
RPC 60A (detector) + 20A (TRB)
Shower 5A
TOF 10A
RICH 25A
MDC 5A
Hubs 8A
Others 8A

-- JanMichel - 26 Jan 2010

Revision r20 - 11 Oct 2010 - 10:24 - SergeyYurevich
Revision r19 - 04 Aug 2010 - 17:29 - GrzegorzKorcyl
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Hades Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)