Difference: DAQUpgradeInstallation (1 vs. 21)

Revision 21
29 Jun 2012 - Main.JanMichel
Line: 1 to 1
Changed:
<
<
META TOPICPARENT name="DaqUpgrade"
>
>
META TOPICPARENT name="OutdatedPages"
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Trigger Distribution

Revision 20
11 Oct 2010 - Main.SergeyYurevich
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 125 to 125
 
  • Port 3: Forward Wall TRB 3
  • Port 5: Hub TRB
  • Port 8: High Voltage 1
Changed:
<
<
  • Port 9: High Voltage 2
>
>
  • Port 9: haepc06 (expert power control)
 
  • Port 12: Uplink, 01C-08

HADSW08 (Shower 5,6) (192.168.100.24)

Revision 19
04 Aug 2010 - Main.GrzegorzKorcyl
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 52 to 52
 
HADSW06 MDC34 1,5,6 TOF 5-X 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
--- RICH 100 3x RICH GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
HADSW07 Foward Wall 30 1x FW GbE, 4x TRB 01C-08  
Added:
>
>
HADSW08 Shower 5,6 100 2x Shower 05Q-20 table, rear right corner
HADSW09 Shower 2,3 100 2x Shower 05Q-19 table, rear right corner
 
Switch 7 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
Switch 8 CTS 5 CTS, other boards on CTS stack 1 on CTS stack
Switch 9 RICH 0 4x Rich / MDC12 SCtrl via Switch 7 RICH TRB stack
Line: 67 to 69
 
  • Port 9: RPC Hub sector 1,2,3
  • Port 12: Uplink, port on wall 05P-18
  • Port A: Shower sector 1
Changed:
<
<
  • Port B: Shower sector 2
  • Port C: Shower sector 3
>
>
  • Port B: Shower sector 2 (moved to HADSW09)
  • Port C: Shower sector 3 (moved to HADSW09)
 

HADSW02 (RPC/Shower 4,5,6) (192.168.100.30)

  • Port 1: RPC/Shower sector 4
Line: 78 to 80
 
  • Port 10: Shower Hub
  • Port 12: Uplink, port on wall 05P-17
  • Port A: Shower sector 4
Changed:
<
<
  • Port B: Shower sector 5
  • Port C: Shower sector 6
>
>
  • Port B: Shower sector 5 (moved to HADSW08)
  • Port C: Shower sector 6 (moved to HADSW08)
 

HADSW03 (MDC 1/2 1,2,3)

Line: 126 to 128
 
  • Port 9: High Voltage 2
  • Port 12: Uplink, 01C-08
Added:
>
>

HADSW08 (Shower 5,6) (192.168.100.24)

  • Port A: Shower 5
  • Port B: Shower 6

HADSW09 (Shower 2,3) (192.168.100.23)

  • Port A: Shower 2
  • Port B: Shower 3
 

Switch 7 (Power Supplies)

  • Ports 1 - 11: power supplies
  • Port 12: MDC1/2, RICH slow control
Revision 18
14 May 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 143 to 143
 
  • Port 7: MDC 1/2
  • Port 8: MDC 3/4
  • Port 9: Forward Wall
Changed:
<
<
  • Port 10:
  • Port 11: RICH 1/2
  • Port 12: RICH 3/4
  • Port 13: RICH 5/6
>
>
  • Port 10: TOF
  • Port 11: Shower
  • Port 12: RICH 1/2
  • Port 13: RICH 3/4
  • Port 14: RICH 5/6
 

RICH 1,2

  • Port 20: Uplink
Line: 212 to 213
 

Deleted:
<
<

Cables needed

Detector Network 1m 5m 10m
RPC E      
RPC T   16 16
Shower E   4 4
Shower T   4 4
TOF E      
TOF T   3 6
RICH E   3  
RICH T     30
MDC34 E   3 3
MDC34 T 3   3
MDC12 E   6  
MDC12 T 6    
Hubs E   4  
Hubs T     20
Others T     20
         
Total   9 40 112
Rounded   10 50 130
 

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.
Revision 17
21 Apr 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 51 to 51
 
HADSW05 MDC34 2,3,4, TOF 1-4 60 3x MDC, 4x TOF 1-4 1 front right corner, new 16/4port switch
HADSW06 MDC34 1,5,6 TOF 5-X 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
--- RICH 100 3x RICH GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
Changed:
<
<
HADSW07 Foward Wall 30 1x FW GbE, 4x TRB    
>
>
HADSW07 Foward Wall 30 1x FW GbE, 4x TRB 01C-08  
 
Switch 7 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
Switch 8 CTS 5 CTS, other boards on CTS stack 1 on CTS stack
Switch 9 RICH 0 4x Rich / MDC12 SCtrl via Switch 7 RICH TRB stack
Line: 102 to 102
 
  • Port 2: TOF 2
  • Port 3: TOF 3
  • Port 4: TOF 4
Added:
>
>
  • Port 8: Mainframe left side
  • Port 9: TOF Hub
  • Port 10: MDC 3/4 Hub
 
  • Port 12: Uplink, 05Q-18

HADSW06 (MDC 3/4 4,5,6)

Line: 113 to 116
 
  • Port 3: TOF X (extra board)
  • Port 12: Uplink, 05Q-16
Added:
>
>

HADSW07 (Forward Wall)

  • Port A: Forward Wall Hub
  • Port 1: Forward Wall TRB 1
  • Port 2: Forward Wall TRB 2
  • Port 3: Forward Wall TRB 3
  • Port 5: Hub TRB
  • Port 8: High Voltage 1
  • Port 9: High Voltage 2
  • Port 12: Uplink, 01C-08
 

Switch 7 (Power Supplies)

  • Ports 1 - 11: power supplies
Line: 122 to 134
 

TrbNet Hubs

Physical connections. Ports 5 to 16 are mapped to Port 1 to 12 internally.
Added:
>
>

Central Hub

  • Port 20: CTS
  • Port 18: SCS
  • Port 5: RPC sec. 1 2 3
  • Port 6: RPC sec. 4 5 6
  • Port 7: MDC 1/2
  • Port 8: MDC 3/4
  • Port 9: Forward Wall
  • Port 10:
  • Port 11: RICH 1/2
  • Port 12: RICH 3/4
  • Port 13: RICH 5/6
 

RICH 1,2

  • Port 20: Uplink
  • Port 17: GBE
Revision 16
13 Apr 2010 - Main.JoernWuestenfeld
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 51 to 51
 
HADSW05 MDC34 2,3,4, TOF 1-4 60 3x MDC, 4x TOF 1-4 1 front right corner, new 16/4port switch
HADSW06 MDC34 1,5,6 TOF 5-X 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
--- RICH 100 3x RICH GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
Changed:
<
<
--- Foward Wall 30 1x FW GbE   no switch, only media converters
>
>
HADSW07 Foward Wall 30 1x FW GbE, 4x TRB    
 
Switch 7 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
Switch 8 CTS 5 CTS, other boards on CTS stack 1 on CTS stack
Switch 9 RICH 0 4x Rich / MDC12 SCtrl via Switch 7 RICH TRB stack
Revision 15
09 Apr 2010 - Main.JoernWuestenfeld
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 48 to 48
 
HADSW02 Shower & RPC 4,5,6 45 6x Shower, 1x RPC 05P-17 rear right corner, new 16/4port switch
HADSW03 MDC12 1,2,3 60 3x MDC 01C-06 under right platform, 12/12port switch
HADSW04 MDC12 4,5,6 60 3x MDC 01C-03 under right platform, 12/12port switch
Changed:
<
<
HADSW05 MDC34 1,2,3 60 3x MDC, 4x TOF 1-4 1 front right corner, new 16/4port switch
HADSW06 MDC34 4,5,6 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
>
>
HADSW05 MDC34 2,3,4, TOF 1-4 60 3x MDC, 4x TOF 1-4 1 front right corner, new 16/4port switch
HADSW06 MDC34 1,5,6 TOF 5-X 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
 
--- RICH 100 3x RICH GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
--- Foward Wall 30 1x FW GbE   no switch, only media converters
Switch 7 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
Revision 14
25 Mar 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Trigger Distribution

  • RPC: One PECL->LVDS converter on each sector
Changed:
<
<
  • Shower: Same as Distributor board as RPC
>
>
  • Shower: Same distributor board as RPC
 
  • TOF: One PECL->LVDS distributor on each sector
  • MDC 3/4: Same as TOF distributor
  • MDC 1/2: One PECL->LVDS distributor on two sectors. Then LVDS connection to FanPW on each sector
  • RICH: own trigger distribution, four LVDS lines from CTS, own LVDS->LVDS distributor board
  • Start, Veto: Connected to TOF-Distributor to have the same jitter on Start and TOF
Changed:
<
<
  • Wall: One PECL-> LVDS distirbutor
>
>
  • Wall: One PECL-> LVDS distributor
 

Total: 6 RPC/Shower, 2 MDC12, 6 TOF/MDC34, 1 Wall -> 15 PECL-LVDS-Boards needed;
Line: 32 to 32
 

TRBs

Detector Amount Configuration
RPC 24 with TDC
Changed:
<
<
TOF 9 with TDC
>
>
TOF 7 with TDC
 
Shower 0 AddOn on RPC-TRB
MDC 0 New MDC Concentratos is a stand-alone board
RICH 0  
Hubs 10 power supply & Etrax only
CTS 2 One board CTS, one for slow control
Changed:
<
<
Others 4 with TDC
>
>
Forward Wall 3 with TDC
Start/Veto 1 with TDC
 
Deleted:
<
<
Total: 38 full TRBs, 9 with power supply and Etrax only, 1 with working FPGA Already installed: 4 TOF boards, 24 RPC boards
 
Changed:
<
<

Big Network Switches

>
>

Network Switches

 
Name Detector Datarate Downlinks Uplinks Position
HADSW01 Shower & RPC 1,2,3 45 6x Shower, 1x RPC 05P-18 rear right corner, new 16/4port switch
HADSW02 Shower & RPC 4,5,6 45 6x Shower, 1x RPC 05P-17 rear right corner, new 16/4port switch
HADSW03 MDC12 1,2,3 60 3x MDC 01C-06 under right platform, 12/12port switch
HADSW04 MDC12 4,5,6 60 3x MDC 01C-03 under right platform, 12/12port switch
Changed:
<
<
HADSW05 MDC34 1,2,3 60 3x MDC 1 front right corner, new 16/4port switch
HADSW06 MDC34 4,5,6 60 3x MDC 1 front right corner, new 16/4port switch
--- RICH 100 3x GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
5 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies

  • CTS, Start, Veto: White switch above MDC LV power supplies (uplink: 01C-02)
  • TOF: 2 white switches in front right corner of mainframe, also used for Hub slowcontrol
  • Wall: White switch
>
>
HADSW05 MDC34 1,2,3 60 3x MDC, 4x TOF 1-4 1 front right corner, new 16/4port switch
HADSW06 MDC34 4,5,6 60 3x MDC, 3x TOF 5,6,X 1 front right corner, new 16/4port switch
--- RICH 100 3x RICH GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
--- Foward Wall 30 1x FW GbE   no switch, only media converters
Switch 7 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
Switch 8 CTS 5 CTS, other boards on CTS stack 1 on CTS stack
Switch 9 RICH 0 4x Rich / MDC12 SCtrl via Switch 7 RICH TRB stack
Switch 10 - 15 RPC / Shower 0 4x RPC TRB, 1x Hadcon via HADSW01/02 on each sector
 

Port Usage

Line: 99 to 98
 
  • Port A: MDC1/2 sector 1
  • Port B: MDC1/2 sector 2
  • Port C: MDC1/2 sector 3
Added:
>
>
  • Port 1: TOF 1
  • Port 2: TOF 2
  • Port 3: TOF 3
  • Port 4: TOF 4
 
  • Port 12: Uplink, 05Q-18

HADSW06 (MDC 3/4 4,5,6)

  • Port A: MDC1/2 sector 4
  • Port B: MDC1/2 sector 5
  • Port C: MDC1/2 sector 6
Added:
>
>
  • Port 1: TOF 5
  • Port 2: TOF 6
  • Port 3: TOF X (extra board)
 
  • Port 12: Uplink, 05Q-16
Changed:
<
<

Switch 6 (Power Supplies)

  • Ports 1 - 11: MDC LV power supplies
>
>

Switch 7 (Power Supplies)

  • Ports 1 - 11: power supplies
 
  • Port 12: MDC1/2, RICH slow control
  • Port 24: Uplink, port 1 on patch panel via white switch
Added:
>
>

TrbNet Hubs

Physical connections. Ports 5 to 16 are mapped to Port 1 to 12 internally.

RICH 1,2

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 9: RICH sector 1, segments 0 - 4
  • Port 10 - 14: RICH sector 2, segments 0 - 4

RICH 3,4

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 9: RICH sector 3, segments 0 - 4
  • Port 10 - 14: RICH sector 4, segments 0 - 4

RICH 5,6

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 9: RICH sector 5, segments 0 - 4
  • Port 10 - 14: RICH sector 6, segments 0 - 4

MDC 1,2

  • Port 20: Uplink
  • Port 5 - 10: MDC plane 1/2, sectors 1 to 6

MDC 3,4

  • Port 20: Uplink
  • Port 5 - 10: MDC plane 3/4, sectors 1 to 6

TOF

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 10: TOF sectors 1 to 6
  • Port 11: TOF extra board

RPC 1,2,3

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 8: RPC sector 1, segments 0 - 3
  • Port 9 - 12: RPC sector 2, segments 0 - 3
  • Port 13 - 16: RPC sector 3, segments 0 - 3

RPC 4,5,6

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 8: RPC sector 4, segments 0 - 3
  • Port 9 - 12: RPC sector 5, segments 0 - 3
  • Port 13 - 16: RPC sector 6, segments 0 - 3

Shower

  • Port 20: Uplink
  • Port 5: Shower sector 6
  • Port 6: Shower sector 5
  • Port 7: Shower sector 4
  • Port 8: Shower sector 3
  • Port 9: Shower sector 2
  • Port 10: Shower sector 1

Forward Wall

  • Port 20: Uplink
  • Port 17: GBE
  • Port 5 - 7: Forward Wall TRB 1 - 3
 
Deleted:
<
<

Cable lengths needed

Detector Network Length Status
RPC T 8x5m, 8x10m, 8x13m/15m - - X - - -
Shower E 2x5m, 2x10m, 2x13m/15m - - X - - -
Shower T 2x5m, 2x10m, 2x13m/15m - - X - - -
TOF T 3x10m, 3x15m - - X - - -
RICH E 3x5m X
RICH T 30x10m -
MDC34 E 3x2m, 3x10m - X
MDC34 T 3x1m, 3x10m - X
MDC12 E 6x5m X
MDC12 T 3x1m, 3x2m - -
Hubs E 3x5m X
Hubs T 10x20m -
Others T 20x10m -

Legend: X: installed
 

Line: 206 to 256
 
    • Lvl3.3 : RICH hub sector 3,4
    • Lvl3.4 : RICH hub sector 5,6

    • Optical switch for MDC1/2
Changed:
<
<
    • Optical switch for RICH

  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply
>
>
    • Media Converters for RICH
 

  • CTS/Start/Veto (height: 6 12 12 12)
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
Line: 217 to 264
 
    • Lvl3 : CTS board
    • Lvl4 : Start/Veto TRB
Changed:
<
<
  • On each TOF sector (height: 12)
>
>
  • On each TOF sector (height: 12), 7 stacks in total
 
Line: 225 to 272
 

48V power supply

In total 5 48V power supplies will be used:
  • 2 for RPC (in old Shower rack)
Changed:
<
<
  • 1/2 for RICH frontends (in place of old MDC camac crate above MDC LV rack)
  • 1 for RPC & Shower TRBs incl. hubs (in old Shower rack)
>
>
  • 1 for RICH frontends (in MDC LV rack)
  • 1 for RPC, FW & Shower TRBs incl. hubs (in old Shower rack)
 
  • 1 for all other TRBs (in MDC LV rack)
Line: 237 to 284
 
RPC 60A (detector) + 20A (TRB)
Shower 5A
TOF 10A
Changed:
<
<
RICH 25A (not clear! Maybe more)
>
>
RICH 25A
 
MDC 5A
Hubs 8A
Others 8A
Revision 13
22 Mar 2010 - Main.JoernWuestenfeld
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 45 to 45
 

Big Network Switches

Changed:
<
<
Number Detector Datarate Downlinks Uplinks Position
1 RICH 110 3x RICH 2 under right platform, 12/12port switch
2 MDC12 120 6x MDC 2 under right platform, 12/12port switch
3 MDC34 120 6x MDC 2 front right corner, 12/12port switch
4 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
5 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
6 MDC LV et.al. 0 8x MDC Power Supplies 1 above MDC LV power supplies
>
>
Name Detector Datarate Downlinks Uplinks Position
HADSW01 Shower & RPC 1,2,3 45 6x Shower, 1x RPC 05P-18 rear right corner, new 16/4port switch
HADSW02 Shower & RPC 4,5,6 45 6x Shower, 1x RPC 05P-17 rear right corner, new 16/4port switch
HADSW03 MDC12 1,2,3 60 3x MDC 01C-06 under right platform, 12/12port switch
HADSW04 MDC12 4,5,6 60 3x MDC 01C-03 under right platform, 12/12port switch
HADSW05 MDC34 1,2,3 60 3x MDC 1 front right corner, new 16/4port switch
HADSW06 MDC34 4,5,6 60 3x MDC 1 front right corner, new 16/4port switch
--- RICH 100 3x GbE 01C-05, 01C-07, 01C-04 under right platform, no switch, only media converters
5 MDC LV et.al. 0 8x MDC Power Supplies 01C-01 above MDC LV power supplies
 
Changed:
<
<
  • CTS, Start, Veto: White switch above MDC LV power supplies
>
>
  • CTS, Start, Veto: White switch above MDC LV power supplies (uplink: 01C-02)
 
  • TOF: 2 white switches in front right corner of mainframe, also used for Hub slowcontrol
  • Wall: White switch

Port Usage

Deleted:
<
<

Switch 1 (RICH)

  • Port 1: RICH sector 1,2
  • Port 2: RICH sector 3,4
  • Port 3: RICH sector 5,6
  • Port 11: Uplink 1, port 3 on patch panel
  • Port 12: Uplink 2, port 4 on patch panel
 
Changed:
<
<

Switch 2 (MDC 1/2)

  • Port 1: MDC1/2 sector 1
  • Port 2: MDC1/2 sector 2
  • Port 3: MDC1/2 sector 3
  • Port 4: MDC1/2 sector 4
  • Port 5: MDC1/2 sector 5
  • Port 6: MDC1/2 sector 6
  • Port 11: Uplink 1, port 7 on patch panel
  • Port 12: Uplink 2, port 8 on patch panel

Switch 3 (MDC 3/4)

  • Port 1: MDC3/4 sector 1
  • Port 2: MDC3/4 sector 2
  • Port 3: MDC3/4 sector 3
  • Port 4: MDC3/4 sector 4
  • Port 5: MDC3/4 sector 5
  • Port 6: MDC3/4 sector 6
  • Port 8: TOF/MDC34 Hub Slowcontrol
  • Port 11: Uplink 1, port on wall 05Q-18
  • Port 12: Uplink 2, port on wall 05Q-16

Switch 4 (RPC/Shower 1,2,3) (192.168.100.29)

>
>

HADSW01 (RPC/Shower 1,2,3) (192.168.100.29)

 
  • Port 1: RPC/Shower sector 1
  • Port 2: RPC/Shower sector 2
  • Port 3: RPC/Shower sector 3
Line: 96 to 71
 
  • Port B: Shower sector 2
  • Port C: Shower sector 3
Changed:
<
<

Switch 5 (RPC/Shower 4,5,6) (192.168.100.30)

>
>

HADSW02 (RPC/Shower 4,5,6) (192.168.100.30)

 
  • Port 1: RPC/Shower sector 4
  • Port 2: RPC/Shower sector 5
  • Port 3: RPC/Shower sector 6
Line: 107 to 82
 
  • Port B: Shower sector 5
  • Port C: Shower sector 6
Added:
>
>

HADSW03 (MDC 1/2 1,2,3)

  • Port 1: MDC1/2 sector 1
  • Port 2: MDC1/2 sector 2
  • Port 3: MDC1/2 sector 3
  • Port 12: Uplink, port 6 on patch panel, 01C-06

HADSW04 (MDC 1/2 4,5,6)

  • Port 1: MDC1/2 sector 4
  • Port 2: MDC1/2 sector 5
  • Port 3: MDC1/2 sector 6
  • Port 12: Uplink, port 3 on patch panel, 01C-03

HADSW05 (MDC 3/4 1,2,3)

  • Port A: MDC1/2 sector 1
  • Port B: MDC1/2 sector 2
  • Port C: MDC1/2 sector 3
  • Port 12: Uplink, 05Q-18

HADSW06 (MDC 3/4 4,5,6)

  • Port A: MDC1/2 sector 4
  • Port B: MDC1/2 sector 5
  • Port C: MDC1/2 sector 6
  • Port 12: Uplink, 05Q-16
 

Switch 6 (Power Supplies)

  • Ports 1 - 11: MDC LV power supplies
  • Port 12: MDC1/2, RICH slow control
Revision 12
01 Feb 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Trigger Distribution

  • RPC: One PECL->LVDS converter on each sector
  • Shower: Same as Distributor board as RPC
Changed:
<
<
  • TOF: One central board for all 6 sectors
  • MDC 3/4: One PECL->LVDS distributor on sector 3 and 5 (easy to reach - does not influence total cable length). Then LVDS connection to FanPW on each sector
>
>
  • TOF: One PECL->LVDS distributor on each sector
  • MDC 3/4: Same as TOF distributor
 
  • MDC 1/2: One PECL->LVDS distributor on two sectors. Then LVDS connection to FanPW on each sector
  • RICH: own trigger distribution, four LVDS lines from CTS, own LVDS->LVDS distributor board
  • Start, Veto: Connected to TOF-Distributor to have the same jitter on Start and TOF
  • Wall: One PECL-> LVDS distirbutor
Changed:
<
<
Total: 6 RPC/Shower, 4 MDC, 1 TOF, 1 Wall -> 12 PECL-LVDS-Boards needed; 1 central PECL-PECL-Fanout board
>
>
Total: 6 RPC/Shower, 2 MDC12, 6 TOF/MDC34, 1 Wall -> 15 PECL-LVDS-Boards needed;
 
Deleted:
<
<
Another idea: Use 6 Boards, one on each sector for MDC3/4 and TOF together.
 

TrbNet Hubs

Line: 33 to 32
 

TRBs

Detector Amount Configuration
RPC 24 with TDC
Changed:
<
<
TOF 6 with TDC
>
>
TOF 9 with TDC
 
Shower 0 AddOn on RPC-TRB
MDC 0 New MDC Concentratos is a stand-alone board
RICH 0  
Hubs 10 power supply & Etrax only
Changed:
<
<
| CTS | 2 | One board CTS, one for slow control
>
>
CTS 2 One board CTS, one for slow control
 
Others 4 with TDC
Changed:
<
<
Total: 34 full TRBs, 9 with power supply and Etrax only, 1 with working FPGA Already installed: 6 TOF boards, 12 RPC boards
>
>
Total: 38 full TRBs, 9 with power supply and Etrax only, 1 with working FPGA Already installed: 4 TOF boards, 24 RPC boards
 
Changed:
<
<

Optical Network Switches

>
>

Big Network Switches

 
Number Detector Datarate Downlinks Uplinks Position
1 RICH 110 3x RICH 2 under right platform, 12/12port switch
Changed:
<
<
2.1 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
2.2 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
>
>
2 MDC12 120 6x MDC 2 under right platform, 12/12port switch
 
3 MDC34 120 6x MDC 2 front right corner, 12/12port switch
Changed:
<
<
4 MDC12 120 6x MDC 2 under right platform, 12/12port switch

Free ports could be used to connect TOF, Start, Veto, Wall...
>
>
4 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
5 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
6 MDC LV et.al. 0 8x MDC Power Supplies 1 above MDC LV power supplies

  • CTS, Start, Veto: White switch above MDC LV power supplies
  • TOF: 2 white switches in front right corner of mainframe, also used for Hub slowcontrol
  • Wall: White switch

Port Usage

Switch 1 (RICH)

  • Port 1: RICH sector 1,2
  • Port 2: RICH sector 3,4
  • Port 3: RICH sector 5,6
  • Port 11: Uplink 1, port 3 on patch panel
  • Port 12: Uplink 2, port 4 on patch panel

Switch 2 (MDC 1/2)

  • Port 1: MDC1/2 sector 1
  • Port 2: MDC1/2 sector 2
  • Port 3: MDC1/2 sector 3
  • Port 4: MDC1/2 sector 4
  • Port 5: MDC1/2 sector 5
  • Port 6: MDC1/2 sector 6
  • Port 11: Uplink 1, port 7 on patch panel
  • Port 12: Uplink 2, port 8 on patch panel

Switch 3 (MDC 3/4)

  • Port 1: MDC3/4 sector 1
  • Port 2: MDC3/4 sector 2
  • Port 3: MDC3/4 sector 3
  • Port 4: MDC3/4 sector 4
  • Port 5: MDC3/4 sector 5
  • Port 6: MDC3/4 sector 6
  • Port 8: TOF/MDC34 Hub Slowcontrol
  • Port 11: Uplink 1, port on wall 05Q-18
  • Port 12: Uplink 2, port on wall 05Q-16

Switch 4 (RPC/Shower 1,2,3) (192.168.100.29)

  • Port 1: RPC/Shower sector 1
  • Port 2: RPC/Shower sector 2
  • Port 3: RPC/Shower sector 3
  • Port 9: RPC Hub sector 1,2,3
  • Port 12: Uplink, port on wall 05P-18
  • Port A: Shower sector 1
  • Port B: Shower sector 2
  • Port C: Shower sector 3

Switch 5 (RPC/Shower 4,5,6) (192.168.100.30)

  • Port 1: RPC/Shower sector 4
  • Port 2: RPC/Shower sector 5
  • Port 3: RPC/Shower sector 6
  • Port 9: RPC Hub sector 4,5,6
  • Port 10: Shower Hub
  • Port 12: Uplink, port on wall 05P-17
  • Port A: Shower sector 4
  • Port B: Shower sector 5
  • Port C: Shower sector 6

Switch 6 (Power Supplies)

  • Ports 1 - 11: MDC LV power supplies
  • Port 12: MDC1/2, RICH slow control
  • Port 24: Uplink, port 1 on patch panel via white switch
 

Cable lengths needed

Detector Network Length Status
Changed:
<
<
RPC T 8x5m, 8x10m, 8x13m/15m - - -
Shower E 2x5m, 2x10m, 2x13m/15m - - -
Shower T 2x5m, 2x10m, 2x13m/15m - - -
TOF T 3x10m, 3x15m - -
>
>
RPC T 8x5m, 8x10m, 8x13m/15m - - X - - -
Shower E 2x5m, 2x10m, 2x13m/15m - - X - - -
Shower T 2x5m, 2x10m, 2x13m/15m - - X - - -
TOF T 3x10m, 3x15m - - X - - -
 
RICH E 3x5m X
RICH T 30x10m -
MDC34 E 3x2m, 3x10m - X
Line: 106 to 163
 

  • Behind RPC detector for each sector (height: 6 6 6 12 12)
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
Changed:
<
<
    • Lvl2 : TRB RPC part4
    • Lvl3 : TRB RPC part3
    • Lvl4 : TRB RPC part2, Shower AddOn
    • Lvl5 : TRB RPC part1, Baseline restorer
>
>
    • Lvl2 : TRB RPC part3
    • Lvl3 : TRB RPC part2
    • Lvl4 : TRB RPC part1, Shower AddOn
    • Lvl5 : TRB RPC part0, Baseline restorer
 

  • Rear right corner of mainframe (height: 6 6 6 6)
Changed:
<
<
    • Lvl1 : 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
>
>
    • Lvl1 : 48V distributor
 
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

Changed:
<
<
    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)
>
>
    • Optical switches (6x Shower, 6x ethernet switch, 3x Hub slow control, 2x uplink)
 

  • Front left corner of mainframe (height: 6 6 6 6)
    • Lvl1 : Ethernet switch, 48V distribution
Revision 11
26 Jan 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 14 to 14
 

Total: 6 RPC/Shower, 4 MDC, 1 TOF, 1 Wall -> 12 PECL-LVDS-Boards needed; 1 central PECL-PECL-Fanout board
Changed:
<
<
>
>
Another idea: Use 6 Boards, one on each sector for MDC3/4 and TOF together.
 

TrbNet Hubs

Line: 38 to 38
 
MDC 0 New MDC Concentratos is a stand-alone board
RICH 0  
Hubs 10 power supply & Etrax only
Changed:
<
<
Others 5 with TDC
>
>
| CTS | 2 | One board CTS, one for slow control
Others 4 with TDC
 
Changed:
<
<
Total: 35 full TRBs, 10 with power supply and Etrax only Already installed: 6 TOF boards, 8 RPC boards
>
>
Total: 34 full TRBs, 9 with power supply and Etrax only, 1 with working FPGA Already installed: 6 TOF boards, 12 RPC boards
 

Optical Network Switches

Number Detector Datarate Downlinks Uplinks Position
Changed:
<
<
1 RICH 110 3x RICH 2 under right platform
2 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner of mainframe
3 MDC34 120 6x MDC 2 front right corner of mainframe
4 MDC12 120 6x MDC 2 under right platform
>
>
1 RICH 110 3x RICH 2 under right platform, 12/12port switch
2.1 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
2.2 Shower & RPC 62 + 32 6x Shower, 1x RPC 2 rear right corner, new 16/4port switch
3 MDC34 120 6x MDC 2 front right corner, 12/12port switch
4 MDC12 120 6x MDC 2 under right platform, 12/12port switch
 

Free ports could be used to connect TOF, Start, Veto, Wall...
Line: 57 to 59
 

Cable lengths needed

Detector Network Length Status
Changed:
<
<
RPC T 8x5m, 8x10m, 8x13m/15m X X X
>
>
RPC T 8x5m, 8x10m, 8x13m/15m - - -
 
Shower E 2x5m, 2x10m, 2x13m/15m - - -
Shower T 2x5m, 2x10m, 2x13m/15m - - -
TOF T 3x10m, 3x15m - -
RICH E 3x5m X
RICH T 30x10m -
Changed:
<
<
MDC34 E 3x5m, 3x10m X X
>
>
MDC34 E 3x2m, 3x10m - X
 
MDC34 T 3x1m, 3x10m - X
MDC12 E 6x5m X
MDC12 T 3x1m, 3x2m - -
Changed:
<
<
Hubs E 1x5m, -
>
>
Hubs E 3x5m X
 
Hubs T 10x20m -
Others T 20x10m -
Changed:
<
<
Legend: -: can not be prepared, +:can be prepared, X: has been prepared (one symbol for each listed length)
>
>
Legend: X: installed
 

Line: 132 to 134
 
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4
Changed:
<
<
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : Ethernet switch, 48V distribution
    • Lvl1.2 : MDCAddOn sector 1
    • Lvl1.3 : MDCAddOn sector 5
    • Lvl1.4 : MDCAddOn sector 6

>
>
  • Beside right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : MDCAddOn sector 1
    • Lvl1.2 : MDCAddOn sector 5
    • Lvl1.3 : MDCAddOn sector 6
    • Lvl1.4 : MDC Hub

 
    • Lvl2.1 : MDCAddOn sector 2
    • Lvl2.2 : MDCAddOn sector 3
    • Lvl2.3 : MDCAddOn sector 4
Line: 151 to 153
 
  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply
Changed:
<
<
  • Old Trigger rack (height: 6 6 12)
>
>
  • CTS/Start/Veto (height: 6 12 12 12)
 
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
Changed:
<
<
    • Lvl2 : Central hub
    • Lvl3 : Trigger board
>
>
    • Lvl2 : Central hub with slow control TRB
    • Lvl3 : CTS board
    • Lvl4 : Start/Veto TRB
 

  • On each TOF sector (height: 12)
Changed:
<
<
Total: 85 plates.
>
>
 

48V power supply

In total 5 48V power supplies will be used:
Changed:
<
<
  • 2 for RPC,
  • 1 for RICH frontends,
  • 1 for RPC & Shower TRBs incl. hubs (all boards in rear part of mainframe)
  • 1 for all other TRBs
>
>
  • 2 for RPC (in old Shower rack)
  • 1/2 for RICH frontends (in place of old MDC camac crate above MDC LV rack)
  • 1 for RPC & Shower TRBs incl. hubs (in old Shower rack)
  • 1 for all other TRBs (in MDC LV rack)
 

Line: 185 to 188
 

Changed:
<
<
-- JanMichel - 07 Jan 2010
>
>
-- JanMichel - 26 Jan 2010
 
Revision 10
07 Jan 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

DAQ Upgrade - Installation of TRB, AddOn, Network...

Line: 9 to 9
 
  • MDC 3/4: One PECL->LVDS distributor on sector 3 and 5 (easy to reach - does not influence total cable length). Then LVDS connection to FanPW on each sector
  • MDC 1/2: One PECL->LVDS distributor on two sectors. Then LVDS connection to FanPW on each sector
  • RICH: own trigger distribution, four LVDS lines from CTS, own LVDS->LVDS distributor board
Changed:
<
<
  • Wall, Start, Veto: -> Wolfgang König
>
>
  • Start, Veto: Connected to TOF-Distributor to have the same jitter on Start and TOF
  • Wall: One PECL-> LVDS distirbutor
 

Total: 6 RPC/Shower, 4 MDC, 1 TOF, 1 Wall -> 12 PECL-LVDS-Boards needed; 1 central PECL-PECL-Fanout board
Line: 184 to 185
 

Changed:
<
<
-- JanMichel - 23 Dec 2009
>
>
-- JanMichel - 07 Jan 2010
 
Revision 9
31 Dec 2009 - Main.JanMichel
Line: 1 to 1
Added:
>
>
META TOPICPARENT name="DaqUpgrade"
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Trigger Distribution

Revision 8
23 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Deleted:
<
<

Status of mountings

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.

  • Behind RPC detector for each sector (height: 6 6 6 12 12)
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
    • Lvl2 : TRB RPC part4
    • Lvl3 : TRB RPC part3
    • Lvl4 : TRB RPC part2, Shower AddOn
    • Lvl5 : TRB RPC part1, Baseline restorer

  • Rear right corner of mainframe (height: 6 6 6 6)
    • Lvl1 : 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)

  • Front left corner of mainframe (height: 6 6 6 6)
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5

  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
    • Lvl1.0 : 48V distribution
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

    • Lvl2.1 : Ethernet switch, trigger distributor (TOF, MDC3/4)
    • Lvl2.2 : MDC3/4 Hub
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4

  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : Ethernet switch, 48V distribution
    • Lvl1.2 : MDCAddOn sector 1
    • Lvl1.3 : MDCAddOn sector 5
    • Lvl1.4 : MDCAddOn sector 6

    • Lvl2.1 : MDCAddOn sector 2
    • Lvl2.2 : MDCAddOn sector 3
    • Lvl2.3 : MDCAddOn sector 4
    • Lvl2.4 : MDC1/2 Hub

    • Lvl3.1 : Ethernet switch, 48V distribution
    • Lvl3.2 : RICH hub sector 1,2
    • Lvl3.3 : RICH hub sector 3,4
    • Lvl3.4 : RICH hub sector 5,6

    • Optical switch for MDC1/2
    • Optical switch for RICH

  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply

  • Old Trigger rack (height: 6 6 12)
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
    • Lvl2 : Central hub
    • Lvl3 : Trigger board

  • On each TOF sector (height: 12)

Total: 85 plates.
 

Trigger Distribution

  • RPC: One PECL->LVDS converter on each sector
  • Shower: Same as Distributor board as RPC
  • TOF: One central board for all 6 sectors
  • MDC 3/4: One PECL->LVDS distributor on sector 3 and 5 (easy to reach - does not influence total cable length). Then LVDS connection to FanPW on each sector
  • MDC 1/2: One PECL->LVDS distributor on two sectors. Then LVDS connection to FanPW on each sector
Changed:
<
<
  • RICH: -> Michael Boehmer
>
>
  • RICH: own trigger distribution, four LVDS lines from CTS, own LVDS->LVDS distributor board
 
  • Wall, Start, Veto: -> Wolfgang König

Total: 6 RPC/Shower, 4 MDC, 1 TOF, 1 Wall -> 12 PECL-LVDS-Boards needed; 1 central PECL-PECL-Fanout board
Line: 89 to 25
 
RICH 3 Gbe under right platform, next to MDC power supplies
CTS / Others 1 maybe Gbe in old trigger rack
Added:
>
>
Total: 10 TRB-Hub2 boards

TRBs

Detector Amount Configuration
RPC 24 with TDC
TOF 6 with TDC
Shower 0 AddOn on RPC-TRB
MDC 0 New MDC Concentratos is a stand-alone board
RICH 0  
Hubs 10 power supply & Etrax only
Others 5 with TDC

Total: 35 full TRBs, 10 with power supply and Etrax only Already installed: 6 TOF boards, 8 RPC boards
 

Optical Network Switches

Number Detector Datarate Downlinks Uplinks Position
Line: 103 to 55
 

Cable lengths needed

Detector Network Length Status
Changed:
<
<
RPC T 8x5m, 8x10m, 8x13m/15m + X +
>
>
RPC T 8x5m, 8x10m, 8x13m/15m X X X
 
Shower E 2x5m, 2x10m, 2x13m/15m - - -
Shower T 2x5m, 2x10m, 2x13m/15m - - -
TOF T 3x10m, 3x15m - -
Changed:
<
<
RICH E 3x5m +
>
>
RICH E 3x5m X
 
RICH T 30x10m -
Changed:
<
<
MDC34 E 3x5m, 3x10m + X
>
>
MDC34 E 3x5m, 3x10m X X
 
MDC34 T 3x1m, 3x10m - X
Changed:
<
<
MDC12 E 6x5m +
>
>
MDC12 E 6x5m X
 
MDC12 T 3x1m, 3x2m - -
Hubs E 1x5m, -
Hubs T 10x20m -
Line: 120 to 72
  Legend: -: can not be prepared, +:can be prepared, X: has been prepared (one symbol for each listed length)
Deleted:
<
<
Totals to be prepared:

Type Amount Done
3x 5m 3 3
4x 5m 4 2
3x 10m 2 2
4x 10m 4 2
 

Cables needed

Line: 142 to 87
 
RICH T     30
MDC34 E   3 3
MDC34 T 3   3
Changed:
<
<
MDC12 E   3 3
MDC12 T 3   3
>
>
MDC12 E   6  
MDC12 T 6    
 
Hubs E   4  
Hubs T     20
Others T     20
         
Changed:
<
<
Total   6 40 112
>
>
Total   9 40 112
 
Rounded   10 50 130
Added:
>
>

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.

  • Behind RPC detector for each sector (height: 6 6 6 12 12)
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
    • Lvl2 : TRB RPC part4
    • Lvl3 : TRB RPC part3
    • Lvl4 : TRB RPC part2, Shower AddOn
    • Lvl5 : TRB RPC part1, Baseline restorer

  • Rear right corner of mainframe (height: 6 6 6 6)
    • Lvl1 : 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)

  • Front left corner of mainframe (height: 6 6 6 6)
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5

  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
    • Lvl1.0 : 48V distribution
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

    • Lvl2.1 : Ethernet switch, trigger distributor (TOF)
    • Lvl2.2 : MDC3/4 Hub
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4

  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : Ethernet switch, 48V distribution
    • Lvl1.2 : MDCAddOn sector 1
    • Lvl1.3 : MDCAddOn sector 5
    • Lvl1.4 : MDCAddOn sector 6

    • Lvl2.1 : MDCAddOn sector 2
    • Lvl2.2 : MDCAddOn sector 3
    • Lvl2.3 : MDCAddOn sector 4
    • Lvl2.4 : MDC1/2 Hub

    • Lvl3.1 : Ethernet switch, 48V distribution
    • Lvl3.2 : RICH hub sector 1,2
    • Lvl3.3 : RICH hub sector 3,4
    • Lvl3.4 : RICH hub sector 5,6

    • Optical switch for MDC1/2
    • Optical switch for RICH

  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply

  • Old Trigger rack (height: 6 6 12)
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
    • Lvl2 : Central hub
    • Lvl3 : Trigger board

  • On each TOF sector (height: 12)

Total: 85 plates.
 

48V power supply

In total 5 48V power supplies will be used:
  • 2 for RPC,
Line: 159 to 166
 
  • 1 for RPC & Shower TRBs incl. hubs (all boards in rear part of mainframe)
  • 1 for all other TRBs
Changed:
<
<
Power Distribution boards: Many PCB are available in the Lab, connectors have to be soldered.
>
>
 

All 3 RPC/Shower power supplies can be installed in a rack next to the rear part. The other 2 in the rack with MDC power supplies.
Line: 176 to 183
 

Changed:
<
<
-- JanMichel - 11 Dec 2009
>
>
-- JanMichel - 23 Dec 2009
 
Revision 7
22 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Status of mountings

Changed:
<
<
  • all stacks have been built (11.12.09)
  • Vladimir can make 10 more plates with additional holes for Ethernet swtich, 48V distribution and trigger distribution
>
>
 

Position of TRB, AddOns, Switches

Line: 17 to 16
 
    • Lvl5 : TRB RPC part1, Baseline restorer

  • Rear right corner of mainframe (height: 6 6 6 6)
Changed:
<
<
    • Lvl1 : Trigger distributor, 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
>
>
    • Lvl1 : 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
 
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

Line: 40 to 39
 
    • Optical switch for MDC3/4

  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
Changed:
<
<
    • Lvl1.1 : Ethernet switch, 48V distribution, trigger distributor (RICH)
>
>
    • Lvl1.1 : Ethernet switch, 48V distribution
 
    • Lvl1.2 : MDCAddOn sector 1
    • Lvl1.3 : MDCAddOn sector 5
    • Lvl1.4 : MDCAddOn sector 6

Line: 48 to 47
 
    • Lvl2.2 : MDCAddOn sector 3
    • Lvl2.3 : MDCAddOn sector 4
    • Lvl2.4 : MDC1/2 Hub

Changed:
<
<
    • Lvl3.1 : Ethernet switch, 48V distribution, trigger distributor (RICH, MDC1/2)
>
>
    • Lvl3.1 : Ethernet switch, 48V distribution
 
    • Lvl3.2 : RICH hub sector 1,2
    • Lvl3.3 : RICH hub sector 3,4
    • Lvl3.4 : RICH hub sector 5,6

Line: 68 to 67
 

Total: 85 plates.
Added:
>
>

Trigger Distribution

  • RPC: One PECL->LVDS converter on each sector
  • Shower: Same as Distributor board as RPC
  • TOF: One central board for all 6 sectors
  • MDC 3/4: One PECL->LVDS distributor on sector 3 and 5 (easy to reach - does not influence total cable length). Then LVDS connection to FanPW on each sector
  • MDC 1/2: One PECL->LVDS distributor on two sectors. Then LVDS connection to FanPW on each sector
  • RICH: -> Michael Boehmer
  • Wall, Start, Veto: -> Wolfgang König

Total: 6 RPC/Shower, 4 MDC, 1 TOF, 1 Wall -> 12 PECL-LVDS-Boards needed; 1 central PECL-PECL-Fanout board
 

TrbNet Hubs

Detector Hubs Setup Position
Revision 6
22 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Status of mountings

Line: 30 to 30
 
    • Lvl4 : MDCAddOn sector 5

  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
Added:
>
>
    • Lvl1.0 : 48V distribution
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

Changed:
<
<
    • Lvl2.1 : Ethernet switch, 48V distribution, trigger distributor (TOF, MDC3/4)
>
>
    • Lvl2.1 : Ethernet switch, trigger distributor (TOF, MDC3/4)
 
    • Lvl2.2 : MDC3/4 Hub
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4
Changed:
<
<
  • Under left platform, left of RICH / MDC 1/2 (height: 6 6 6 6)
    • Lvl1 : Ethernet switch, 48V distribution, trigger distributor (RICH)
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 5
    • Lvl4 : MDCAddOn sector 6

  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4
    • Lvl1.4 : MDC1/2 Hub

    • Lvl2.1 : Ethernet switch, 48V distribution, trigger distributor (RICH, MDC1/2)
    • Lvl2.2 : RICH hub sector 1,2
    • Lvl2.3 : RICH hub sector 3,4
    • Lvl2.4 : RICH hub sector 5,6

>
>
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6 / 6 6 6 6)
    • Lvl1.1 : Ethernet switch, 48V distribution, trigger distributor (RICH)
    • Lvl1.2 : MDCAddOn sector 1
    • Lvl1.3 : MDCAddOn sector 5
    • Lvl1.4 : MDCAddOn sector 6

    • Lvl2.1 : MDCAddOn sector 2
    • Lvl2.2 : MDCAddOn sector 3
    • Lvl2.3 : MDCAddOn sector 4
    • Lvl2.4 : MDC1/2 Hub

    • Lvl3.1 : Ethernet switch, 48V distribution, trigger distributor (RICH, MDC1/2)
    • Lvl3.2 : RICH hub sector 1,2
    • Lvl3.3 : RICH hub sector 3,4
    • Lvl3.4 : RICH hub sector 5,6

 
    • Optical switch for MDC1/2
    • Optical switch for RICH
Line: 102 to 101
 
RICH T 30x10m -
MDC34 E 3x5m, 3x10m + X
MDC34 T 3x1m, 3x10m - X
Changed:
<
<
MDC12 E 3x5m, 3x10m + +
MDC12 T 3x1m, 3x10m - +
>
>
MDC12 E 6x5m +
MDC12 T 3x1m, 3x2m - -
 
Hubs E 1x5m, -
Hubs T 10x20m -
Others T 20x10m -
Line: 114 to 113
  Totals to be prepared:

Type Amount Done
Changed:
<
<
3x 5m 3 0
4x 5m 4 0
3x 10m 4 2
>
>
3x 5m 3 3
4x 5m 4 2
3x 10m 2 2
 
4x 10m 4 2
Revision 5
11 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Added:
>
>

Status of mountings

  • all stacks have been built (11.12.09)
  • Vladimir can make 10 more plates with additional holes for Ethernet swtich, 48V distribution and trigger distribution
 

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.
Changed:
<
<
  • Behind RPC detector for each sector (height: 6 6 6 12 12, all are built)
>
>
  • Behind RPC detector for each sector (height: 6 6 6 12 12)
 
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
    • Lvl2 : TRB RPC part4
    • Lvl3 : TRB RPC part3
    • Lvl4 : TRB RPC part2, Shower AddOn
    • Lvl5 : TRB RPC part1, Baseline restorer
Changed:
<
<
  • Rear right corner of mainframe (height: 6 6 6 6, built)
>
>
  • Rear right corner of mainframe (height: 6 6 6 6)
 
    • Lvl1 : Trigger distributor, 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)
Changed:
<
<
  • Front left corner of mainframe (height: 6 6 6 6, built)
>
>
  • Front left corner of mainframe (height: 6 6 6 6)
 
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5
Changed:
<
<
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6, built)
>
>
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

Line: 33 to 38
 
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4
Changed:
<
<
  • Under left platform, left of RICH / MDC 1/2 (height: 6 6 6 6, built)
>
>
  • Under left platform, left of RICH / MDC 1/2 (height: 6 6 6 6)
 
    • Lvl1 : Ethernet switch, 48V distribution, trigger distributor (RICH)
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 5
    • Lvl4 : MDCAddOn sector 6
Changed:
<
<
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6, built)
>
>
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4
Line: 54 to 59
 
  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply
Changed:
<
<
  • Old Trigger rack (height: 6 6 12, built)
>
>
  • Old Trigger rack (height: 6 6 12)
 
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
    • Lvl2 : Central hub
    • Lvl3 : Trigger board
Line: 88 to 93
 

Cable lengths needed

Changed:
<
<
Detector Network Length
RPC T 8x5m, 8x10m, 8x13m/15m
Shower E 2x5m, 2x10m, 2x13m/15m
Shower T 2x5m, 2x10m, 2x13m/15m
TOF T 3x10m, 3x15m
RICH E 3x5m
RICH T 30x10m
MDC34 E 3x5m, 3x10m
MDC34 T 3x1m, 3x10m
MDC12 E 3x5m, 3x10m
MDC12 T 3x1m, 3x10m
Hubs E 1x5m,
Hubs T 10x20m
Others T 20x10m
>
>
Detector Network Length Status
RPC T 8x5m, 8x10m, 8x13m/15m + X +
Shower E 2x5m, 2x10m, 2x13m/15m - - -
Shower T 2x5m, 2x10m, 2x13m/15m - - -
TOF T 3x10m, 3x15m - -
RICH E 3x5m +
RICH T 30x10m -
MDC34 E 3x5m, 3x10m + X
MDC34 T 3x1m, 3x10m - X
MDC12 E 3x5m, 3x10m + +
MDC12 T 3x1m, 3x10m - +
Hubs E 1x5m, -
Hubs T 10x20m -
Others T 20x10m -

Legend: -: can not be prepared, +:can be prepared, X: has been prepared (one symbol for each listed length)

Totals to be prepared:

Type Amount Done
3x 5m 3 0
4x 5m 4 0
3x 10m 4 2
4x 10m 4 2
 

Cables needed

Line: 135 to 150
 
  • 1 for RPC & Shower TRBs incl. hubs (all boards in rear part of mainframe)
  • 1 for all other TRBs
Added:
>
>
Power Distribution boards: Many PCB are available in the Lab, connectors have to be soldered.
  All 3 RPC/Shower power supplies can be installed in a rack next to the rear part. The other 2 in the rack with MDC power supplies.

Detector Current
Revision 4
11 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Position of TRB, AddOns, Switches

Line: 11 to 11
 
    • Lvl4 : TRB RPC part2, Shower AddOn
    • Lvl5 : TRB RPC part1, Baseline restorer
Changed:
<
<
  • Rear right corner of mainframe (height: 6 6 6 6)
>
>
  • Rear right corner of mainframe (height: 6 6 6 6, built)
 
    • Lvl1 : Trigger distributor, 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)
Changed:
<
<
  • Front left corner of mainframe (height: 6 6 6 6, already built)
>
>
  • Front left corner of mainframe (height: 6 6 6 6, built)
 
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5
Changed:
<
<
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6, stack 1 built)
>
>
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6, built)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

Line: 39 to 39
 
    • Lvl3 : MDCAddOn sector 5
    • Lvl4 : MDCAddOn sector 6
Changed:
<
<
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6)
>
>
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6, built)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4
Line: 54 to 54
 
  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply
Changed:
<
<
  • Old Trigger rack (height: 6 6 12)
>
>
  • Old Trigger rack (height: 6 6 12, built)
 
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
    • Lvl2 : Central hub
    • Lvl3 : Trigger board
Revision 3
11 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.
Changed:
<
<
  • Behind RPC detector for each sector (height: 6 6 6 12 12)
>
>
  • Behind RPC detector for each sector (height: 6 6 6 12 12, all are built)
 
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
    • Lvl2 : TRB RPC part4
    • Lvl3 : TRB RPC part3
Line: 18 to 18
 
    • Lvl4 : Shower hub (all sectors)

    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)
Changed:
<
<
  • Front left corner of mainframe (height: 6 6 6 6)
>
>
  • Front left corner of mainframe (height: 6 6 6 6, already built)
 
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5
Changed:
<
<
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
>
>
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6, stack 1 built)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

Line: 33 to 33
 
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4
Changed:
<
<
  • Under left platform, left of RICH / MDC 1/2 (height: 6 6 6 6)
>
>
  • Under left platform, left of RICH / MDC 1/2 (height: 6 6 6 6, built)
 
    • Lvl1 : Ethernet switch, 48V distribution, trigger distributor (RICH)
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 5
Revision 2
11 Dec 2009 - Main.JanMichel
Line: 1 to 1
 

DAQ Upgrade - Installation of TRB, AddOn, Network...

Position of TRB, AddOns, Switches

Here is the list of installations needed, ordered by location. "Lvln" refers to the level in the stack of boards.
Changed:
<
<
  • Behind RPC detector for each sector:
>
>
  • Behind RPC detector for each sector (height: 6 6 6 12 12)
 
    • Lvl1 : Ethernet switch (4x TRB, 1x uplink), 48V distribution, Trigger distribution
    • Lvl2 : TRB RPC part4
    • Lvl3 : TRB RPC part3
    • Lvl4 : TRB RPC part2, Shower AddOn
    • Lvl5 : TRB RPC part1, Baseline restorer
Changed:
<
<
  • Rear right corner of mainframe
>
>
  • Rear right corner of mainframe (height: 6 6 6 6)
 
    • Lvl1 : Trigger distributor, 48V distributor, 2 Ethernet switches (each serves 3 switches for RPC, 1 or 2 TRB from this stack, 1x uplink)
    • Lvl2 : RPC hub 1 (sector 1,2,3)
    • Lvl3 : RPC hub 2 (sector 4,5,6)
    • Lvl4 : Shower hub (all sectors)

    • Optical switch (6x Shower, 2x ethernet switch, 3x uplink)
Changed:
<
<
  • Front left corner of mainframe
>
>
  • Front left corner of mainframe (height: 6 6 6 6)
 
    • Lvl1 : Ethernet switch, 48V distribution
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 6
    • Lvl4 : MDCAddOn sector 5
Changed:
<
<
  • Front right corner of mainframe
>
>
  • Front right corner of mainframe (height: 6 6 6 / 6 6 6)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
    • Lvl1.3 : MDCAddOn sector 4

Line: 33 to 33
 
    • Lvl2.3 : TOF Hub

    • Optical switch for MDC3/4
Changed:
<
<
  • Under left platform, left of RICH / MDC 1/2
>
>
  • Under left platform, left of RICH / MDC 1/2 (height: 6 6 6 6)
 
    • Lvl1 : Ethernet switch, 48V distribution, trigger distributor (RICH)
    • Lvl2 : MDCAddOn sector 1
    • Lvl3 : MDCAddOn sector 5
    • Lvl4 : MDCAddOn sector 6
Deleted:
<
<
    • Lvl5 : RICH hub sector 5,6
 
Changed:
<
<
  • Under right platform, right of RICH / MDC 1/2
>
>
  • Under right platform, right of RICH / MDC 1/2 (height: 6 6 6 6 / 6 6 6 6)
 
    • Lvl1.1 : MDCAddOn sector 2
    • Lvl1.2 : MDCAddOn sector 3
Changed:
<
<
    • Lvl1.3 : MDCAddOn sector 4

>
>
    • Lvl1.3 : MDCAddOn sector 4
    • Lvl1.4 : MDC1/2 Hub

 
    • Lvl2.1 : Ethernet switch, 48V distribution, trigger distributor (RICH, MDC1/2)
Changed:
<
<
    • Lvl2.2 : MDC1/2 Hub
    • Lvl2.3 : RICH hub sector 1,2
    • Lvl2.4 : RICH hub sector 3,4

>
>
    • Lvl2.2 : RICH hub sector 1,2
    • Lvl2.3 : RICH hub sector 3,4
    • Lvl2.4 : RICH hub sector 5,6

 
    • Optical switch for MDC1/2
    • Optical switch for RICH

  • Rack near rear end of mainframe
    • 3x 48V RPC & Shower power supply
Changed:
<
<
  • Old Trigger rack
>
>
  • Old Trigger rack (height: 6 6 12)
 
    • Lvl1 : Ethernet switch, 48V distribution, Trigger distribution
    • Lvl2 : Central hub
    • Lvl3 : Trigger board
Added:
>
>
  • On each TOF sector (height: 12)

Total: 85 plates.
 

TrbNet Hubs

Line: 131 to 135
 
  • 1 for RPC & Shower TRBs incl. hubs (all boards in rear part of mainframe)
  • 1 for all other TRBs
Changed:
<
<
All 3 RPC/Shower power supplies can be installed in a rack next in the rear part. The other 2 in the rack with MDC power supplies.
>
>
All 3 RPC/Shower power supplies can be installed in a rack next to the rear part. The other 2 in the rack with MDC power supplies.
 

Detector Current
RPC 60A (detector) + 20A (TRB)
Line: 146 to 150
 

Changed:
<
<
-- JanMichel - 10 Dec 2009
>
>
-- JanMichel - 11 Dec 2009
 
 