Difference: DAQUpgradeLogbook (1 vs. 13)

Revision 13
07 May 2010 - Main.MichaelTraxler
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 8 to 8
 
  • Re-Install MDC Analog Out connection to Counting House (Erwin)
  • Add fans where missing
  • Install trigger cables TOF-MDC34
Changed:
<
<
  • Install trigger cables for RPC
>
>
  • Install trigger cables for RPC (Alberto)
 
  • Install trigger cables for Forward Wall
  • Adjust all FanPW to final settings
  • Connect power for RPC switches
Changed:
<
<
  • Install RPC Hadcon
>
>
  • Install RPC Hadcon (Alberto)
 
  • MDC - what is missing?
Revision 12
07 May 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 6 to 6
 
  • Remove obsolete cables - still a topic wink (Everybody who is familiar with the old setup)
  • Install temperature sensors for RICH power supplies
  • Re-Install MDC Analog Out connection to Counting House (Erwin)
Deleted:
<
<
  • Move TOF trigger crate to place next to CTS (old place of MDC nim crate)
 
  • Add fans where missing
Deleted:
<
<
  • Change trigger setup according to Michael's mail
 
  • Install trigger cables TOF-MDC34
  • Install trigger cables for RPC
  • Install trigger cables for Forward Wall
Deleted:
<
<
  • Install Forward Wall Hub
 
  • Adjust all FanPW to final settings
  • Connect power for RPC switches
  • Install RPC Hadcon
Line: 110 to 107
 
  • Finished testing & labelling half of temperature sensors for MDC 3/4
  • Lay all DAQ cables to each RPC/Shower sector (1x trigger, 6x optical cable, 1x Ethernet, 1x Temp.Sens. 2x CAN)
Added:
>
>
07.05.2010
  • Installed Forward Wall Hub
  • Changed trigger setup according to Michael's mail
 

-- JanMichel - 29 Jan 2010
Revision 11
06 May 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 14 to 14
 
  • Install trigger cables for Forward Wall
  • Install Forward Wall Hub
  • Adjust all FanPW to final settings
Added:
>
>
  • Connect power for RPC switches
  • Install RPC Hadcon
 
  • MDC - what is missing?
Revision 10
05 May 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 13 to 13
 
  • Install trigger cables for RPC
  • Install trigger cables for Forward Wall
  • Install Forward Wall Hub
Added:
>
>
  • Adjust all FanPW to final settings
 
  • MDC - what is missing?
Revision 9
04 May 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:

  • Remove obsolete cables - still a topic wink (Everybody who is familiar with the old setup)
Changed:
<
<
  • 48V cable for CTS stack (Torsten)
  • Install temperature sensors for MDC plane 1 and 2 (Joern)
  • Test all MDC temperature sensors, make a list of them (Joern)
  • Install power/network cables for TOF boards (Erwin)
  • Prepare trigger cables for MDC (Jan)
  • Install RPC stacks (Alberto)
>
>
  • Install temperature sensors for RICH power supplies
 
  • Re-Install MDC Analog Out connection to Counting House (Erwin)
Changed:
<
<
  • Finish soldering temperature sensors for MDC 3/4 (Joern)
  • Remove MDC Camac crate above MDC LV rack - here RICH power supplies will be installed (Torsten)
  • Add fans to two of the nine TOF stacks with power distributor (Jan)
  • Install cable guides in fron & rear right corner on both diagonal supports (Erwin)
  • Lay cables to TOF sectors (1x 48V, 1/2 Ethernet, 1 spare Ethernet (maybe temp. sens. for MDC), 1/2 optical cables, 1 trigger cable) (Erwin)
  • Install FanPW on MDC 3/4 (Torsten, Erwin)
  • Fix optical switches in front right corner (Andreas)

Delayed tasks

Tasks delayed due to various reasons & responsible people:

  • Put connectors on MDC 1/2 LV cables - wait until planes are in place (Torsten)
  • Put connectors on MDC 1/2 optical cables - wait until planes are in place (Torsten)
  • Lay MDC 1/2 optical cables - delayed until new tubes arrive (Torsten)
>
>
  • Move TOF trigger crate to place next to CTS (old place of MDC nim crate)
  • Add fans where missing
  • Change trigger setup according to Michael's mail
  • Install trigger cables TOF-MDC34
  • Install trigger cables for RPC
  • Install trigger cables for Forward Wall
  • Install Forward Wall Hub
  • MDC - what is missing?
 

Logbook

Revision 8
23 Feb 2010 - Main.SergeyYurevich
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 106 to 106
 
  • Installed cable guide on rear corners (Torsten, Andreas, Jan)
  • Continued with TOF cables (Erwin)
Added:
>
>
18.02.2010
  • Two stacks with TRBs for RPC built and tested (CTS, old HUB, readout) and ready for mounting (Marek, Sergey)

19.02.2010
  • Four TRBs for TOF tested (CTS, old HUB, readout) and ready for mounting (Marek, Sergey)
  22.02.2010 (and before)
  • Install new cable guides to RPC/Shower
  • Soldered temperature sensor hub boards
Revision 7
22 Feb 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 7 to 7
 
  • 48V cable for CTS stack (Torsten)
  • Install temperature sensors for MDC plane 1 and 2 (Joern)
  • Test all MDC temperature sensors, make a list of them (Joern)
Deleted:
<
<
  • Lay Gbit optical cables for Shower / RPC (Alberto)
 
  • Install power/network cables for TOF boards (Erwin)
  • Prepare trigger cables for MDC (Jan)
  • Install RPC stacks (Alberto)
Line: 18 to 17
 
  • Install cable guides in fron & rear right corner on both diagonal supports (Erwin)
  • Lay cables to TOF sectors (1x 48V, 1/2 Ethernet, 1 spare Ethernet (maybe temp. sens. for MDC), 1/2 optical cables, 1 trigger cable) (Erwin)
  • Install FanPW on MDC 3/4 (Torsten, Erwin)
Deleted:
<
<
  • Install new cable guides to RPC/Shower (Torsten)
 
  • Fix optical switches in front right corner (Andreas)
Deleted:
<
<
  • Lay all DAQ cables to each RPC/Shower sector (1x trigger, 6x optical cable, 1x Ethernet, 1x Temp.Sens. 2x CAN) (Alberto)
  • Find company to solder temperature sensor hub boards (Michael)
 

Delayed tasks

Line: 110 to 106
 
  • Installed cable guide on rear corners (Torsten, Andreas, Jan)
  • Continued with TOF cables (Erwin)
Added:
>
>
22.02.2010 (and before)
  • Install new cable guides to RPC/Shower
  • Soldered temperature sensor hub boards
  • Soldered CTS trigger fanout boards
  • Finished testing & labelling half of temperature sensors for MDC 3/4
  • Lay all DAQ cables to each RPC/Shower sector (1x trigger, 6x optical cable, 1x Ethernet, 1x Temp.Sens. 2x CAN)
 

-- JanMichel - 29 Jan 2010
Revision 6
09 Feb 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 7 to 7
 
  • 48V cable for CTS stack (Torsten)
  • Install temperature sensors for MDC plane 1 and 2 (Joern)
  • Test all MDC temperature sensors, make a list of them (Joern)
Deleted:
<
<
  • Connect RPC power cables on all sectors (Torsten)
 
  • Lay Gbit optical cables for Shower / RPC (Alberto)
  • Install power/network cables for TOF boards (Erwin)
  • Prepare trigger cables for MDC (Jan)
Line: 15 to 14
 
  • Re-Install MDC Analog Out connection to Counting House (Erwin)
  • Finish soldering temperature sensors for MDC 3/4 (Joern)
  • Remove MDC Camac crate above MDC LV rack - here RICH power supplies will be installed (Torsten)
Changed:
<
<
  • Add fans and trigger distributor boards to the six TOF stacks with power distributor (Jan)
>
>
  • Add fans to two of the nine TOF stacks with power distributor (Jan)
 
  • Install cable guides in fron & rear right corner on both diagonal supports (Erwin)
  • Lay cables to TOF sectors (1x 48V, 1/2 Ethernet, 1 spare Ethernet (maybe temp. sens. for MDC), 1/2 optical cables, 1 trigger cable) (Erwin)
  • Install FanPW on MDC 3/4 (Torsten, Erwin)
Line: 107 to 106
  03.02.2010
  • Three stacks of RPC TRBs successfully tested (CTS, old HUB, readout) and ready for mounting (Marek, Sergey)
Added:
>
>
09.02.2010
  • Installed cable guide on rear corners (Torsten, Andreas, Jan)
  • Continued with TOF cables (Erwin)

  -- JanMichel - 29 Jan 2010
Revision 5
03 Feb 2010 - Main.SergeyYurevich
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 104 to 104
 
  • Put cables for TOF on sector 3
  • Prepared cables for RPC / Shower to be put into new cable chains.
Changed:
<
<
>
>
03.02.2010
  • Three stacks of RPC TRBs successfully tested (CTS, old HUB, readout) and ready for mounting (Marek, Sergey)
 

-- JanMichel - 29 Jan 2010
Revision 4
01 Feb 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 8 to 8
 
  • Install temperature sensors for MDC plane 1 and 2 (Joern)
  • Test all MDC temperature sensors, make a list of them (Joern)
  • Connect RPC power cables on all sectors (Torsten)
Deleted:
<
<
  • Move the RPC setup from right to left side (Jan)
 
  • Lay Gbit optical cables for Shower / RPC (Alberto)
  • Install power/network cables for TOF boards (Erwin)
  • Prepare trigger cables for MDC (Jan)
Line: 16 to 15
 
  • Re-Install MDC Analog Out connection to Counting House (Erwin)
  • Finish soldering temperature sensors for MDC 3/4 (Joern)
  • Remove MDC Camac crate above MDC LV rack - here RICH power supplies will be installed (Torsten)
Deleted:
<
<
  • Build holder for CTS boards (Andreas)
 
  • Add fans and trigger distributor boards to the six TOF stacks with power distributor (Jan)
Changed:
<
<
  • Install cable guides in rear right corner on both diagonal supports (Erwin)
>
>
  • Install cable guides in fron & rear right corner on both diagonal supports (Erwin)
 
  • Lay cables to TOF sectors (1x 48V, 1/2 Ethernet, 1 spare Ethernet (maybe temp. sens. for MDC), 1/2 optical cables, 1 trigger cable) (Erwin)
  • Install FanPW on MDC 3/4 (Torsten, Erwin)
  • Install new cable guides to RPC/Shower (Torsten)
  • Fix optical switches in front right corner (Andreas)
Changed:
<
<
  • Lay all DAQ cables to each RPC/Shower sector (1x trigger, 6x optical cable, 1x Ethernet, 1x Temp.Sens.) (Alberto)
>
>
  • Lay all DAQ cables to each RPC/Shower sector (1x trigger, 6x optical cable, 1x Ethernet, 1x Temp.Sens. 2x CAN) (Alberto)
 
  • Find company to solder temperature sensor hub boards (Michael)
Line: 98 to 98
 
  • Put RJ45 connectors on PCB for temperature sensors (Paul, Erik)
  • Started removing temporary RPC setup (Jan)
Added:
>
>
01.02.2010
  • Removed all temporary RPC setups
  • Uninstalled LV power supplies for making changes
  • Put cables for TOF on sector 3
  • Prepared cables for RPC / Shower to be put into new cable chains.

  -- JanMichel - 29 Jan 2010
Revision 3
29 Jan 2010 - Main.MarekPalka
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:
Line: 87 to 87
  27.01.2010
  • Prepared two new trigger cables for RPC (Kathrin)
  • Change power supply for RPC to final setup (Torsten, Jan)
Changed:
<
<
>
>
28.01.2010
  • The last three stacks prepared for RPC (Marek,Sergey)
  29.01.2010
  • Prepared six TRB stacks for TOF with Power distributor (Erik)
  • Installed two network switches in rear right corner, including cables (Jan)
Revision 2
29 Jan 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Open Tasks

Tasks currently on our agenda:

  • Remove obsolete cables - still a topic wink (Everybody who is familiar with the old setup)
  • 48V cable for CTS stack (Torsten)
Deleted:
<
<
  • Change power supply for RPC to final setup (Torsten, Jan)
 
  • Install temperature sensors for MDC plane 1 and 2 (Joern)
  • Test all MDC temperature sensors, make a list of them (Joern)
  • Connect RPC power cables on all sectors (Torsten)
  • Move the RPC setup from right to left side (Jan)
Changed:
<
<
  • Lay Gbit optical cables for Shower / RPC (Jan)
  • Prepare 48V cables for TOF: 1 cable for both fan and TRB (?)
  • Install power/network cables for TOF boards (?)
  • Prepare trigger cables for MDC - setup has to be discussed
  • Install RPC stacks (Jan)
>
>
  • Lay Gbit optical cables for Shower / RPC (Alberto)
  • Install power/network cables for TOF boards (Erwin)
  • Prepare trigger cables for MDC (Jan)
  • Install RPC stacks (Alberto)
 
  • Re-Install MDC Analog Out connection to Counting House (Erwin)
Changed:
<
<
  • Finish soldering temperature sensors for MDC 3/4 (Michael)
>
>
  • Finish soldering temperature sensors for MDC 3/4 (Joern)
 
  • Remove MDC Camac crate above MDC LV rack - here RICH power supplies will be installed (Torsten)
  • Build holder for CTS boards (Andreas)
Changed:
<
<
  • Prepare two new trigger cables for RPC (Jan)
>
>
  • Add fans and trigger distributor boards to the six TOF stacks with power distributor (Jan)
  • Install cable guides in rear right corner on both diagonal supports (Erwin)
  • Lay cables to TOF sectors (1x 48V, 1/2 Ethernet, 1 spare Ethernet (maybe temp. sens. for MDC), 1/2 optical cables, 1 trigger cable) (Erwin)
  • Install FanPW on MDC 3/4 (Torsten, Erwin)
  • Install new cable guides to RPC/Shower (Torsten)
  • Fix optical switches in front right corner (Andreas)
  • Lay all DAQ cables to each RPC/Shower sector (1x trigger, 6x optical cable, 1x Ethernet, 1x Temp.Sens.) (Alberto)
  • Find company to solder temperature sensor hub boards (Michael)
 

Delayed tasks

Tasks delayed due to various reasons & responsible people:
Deleted:
<
<
  • Install FanPW - holders are not ready (Joern)
  • Solder temperature sensor "hub" boards - components not available (Michael)
 
  • Put connectors on MDC 1/2 LV cables - wait until planes are in place (Torsten)
  • Put connectors on MDC 1/2 optical cables - wait until planes are in place (Torsten)
  • Lay MDC 1/2 optical cables - delayed until new tubes arrive (Torsten)
Line: 84 to 84
 
  • Equipped one more RPC stack (Marek, Jan)
  • Prepared power cables for Trigger distributor board (Jan)
Added:
>
>
27.01.2010
  • Prepared two new trigger cables for RPC (Kathrin)
  • Change power supply for RPC to final setup (Torsten, Jan)

29.01.2010
  • Prepared six TRB stacks for TOF with Power distributor (Erik)
  • Installed two network switches in rear right corner, including cables (Jan)
  • Labeled most of RPC cables individually (Kathrin)
  • Layed trigger cable (17pair) from CTS to both TOF/MDC34 and RPC/Shower / corner of mainframe (Erwin, Jan)
  • Prepared more 50cm 48V cables (Paul)
  • Put RJ45 connectors on PCB for temperature sensors (Paul, Erik)
  • Started removing temporary RPC setup (Jan)
 
Changed:
<
<
-- JanMichel - 26 Jan 2010
>
>
-- JanMichel - 29 Jan 2010
 
 