Difference: DaqTodoList (1 vs. 9)

Revision 9
06 Jan 2011 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 16 to 16
 
7 Solve segmentation fault errors in daqop monitors switched to perl Boris
7 Update daqop monitor to show new CTS registers done SY
5 Implement multi-threading in all Perl based monitors not started  
Changed:
<
<
5 Write Pexor - TrbNet - Code not started JM, LM
>
>
5 Write Pexor - TrbNet - Code started JM, LM
7 Tool to monitoring boards that fail / disappear / switch off not started SY
 

Software

Line: 39 to 40
 

CTS

Prio. Topic Status Person
Changed:
<
<
8 Implement optical link for SCM partly prepared by MB MP, JM
>
>
8 Implement optical link for SCM working, needs patch on CTS MP, JM
 

TOF systems

Revision 8
29 Nov 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 12 to 12
 

Monitoring

Prio. Topic Status Person
Changed:
<
<
7 Show error messages from trbcmd in daqop done Boris
7 Solve segmentation fault errors in daqop monitors switched to perl Boris
7 Update daqop monitor to show new CTS registers not started  
>
>
7 Show error messages from trbcmd in daqop done Boris
7 Solve segmentation fault errors in daqop monitors switched to perl Boris
7 Update daqop monitor to show new CTS registers done SY
 
5 Implement multi-threading in all Perl based monitors not started  
Changed:
<
<
>
>
5 Write Pexor - TrbNet - Code not started JM, LM
 

Software

Line: 31 to 31
 
7 Implement & test LVL1 handler 2010-10-10: finished GK
7 LVL1 handler statistics and status registers 2010-10-10: finished GK
9 Finish implementing retransmission feature seems to be working, waiting for beam JM
Changed:
<
<
5 Prepare including a second TRB for slow control purposes not started JM
>
>
5 Prepare including a second TRB for slow control purposes done JM
 
5 Solve Gbe errors (frame buffer full, no link) 2010-10-10: finished GK
5 Compress unnecessary headers in hub   JM
5 Compress MDC data   JM
Line: 44 to 44
 

TOF systems

Prio. Topic Status Person
Changed:
<
<
5 Downscaling of the headers and trailers from the TDCs (reducing the amount of the data from this systems) not started MP
>
>
5 Downscaling of the headers and trailers from the TDCs (reducing the amount of the data from this systems) done MP
 

Revision 7
16 Oct 2010 - Main.BorislavMilanovic
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 12 to 12
 

Monitoring

Prio. Topic Status Person
Changed:
<
<
7 Show error messages from trbcmd in daqop not started  
7 Solve segmentation fault errors in daqop monitors not started  
>
>
7 Show error messages from trbcmd in daqop done Boris
7 Solve segmentation fault errors in daqop monitors switched to perl Boris
 
7 Update daqop monitor to show new CTS registers not started  
5 Implement multi-threading in all Perl based monitors not started  
Revision 6
14 Oct 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 21 to 21
 

Software

Prio. Topic Status Person
Changed:
<
<
7 Investigate discarded events problem in EB above approx. 5 kHz & discarded 0x9 type events   SY
>
>
7 Investigate discarded events problem in EB above approx. 5 kHz & discarded 0x9 type events 14.10. - seems to be solved / understood SY
 
5 Improve speed of start-up sequence    

TrbNet

Prio. Topic Status Person
Changed:
<
<
7 Implement & test LVL1 handler prepared, under test GK
7 LVL1 handler statistics and status registers   GK
9 Finish implementing retransmission feature testing JM
>
>
7 Implement & test LVL1 handler 2010-10-10: finished GK
7 LVL1 handler statistics and status registers 2010-10-10: finished GK
9 Finish implementing retransmission feature seems to be working, waiting for beam JM
 
5 Prepare including a second TRB for slow control purposes not started JM
Changed:
<
<
5 Solve Gbe errors (frame buffer full, no link)   GK
>
>
5 Solve Gbe errors (frame buffer full, no link) 2010-10-10: finished GK
 
5 Compress unnecessary headers in hub   JM
5 Compress MDC data   JM
Changed:
<
<
>
>
5 Implement multi-event queues started GK
 

CTS

Prio. Topic Status Person
Revision 5
28 Sep 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 29 to 29
 

TrbNet

Prio. Topic Status Person
7 Implement & test LVL1 handler prepared, under test GK
Added:
>
>
7 LVL1 handler statistics and status registers   GK
 
9 Finish implementing retransmission feature testing JM
5 Prepare including a second TRB for slow control purposes not started JM
5 Solve Gbe errors (frame buffer full, no link)   GK
Revision 4
27 Sep 2010 - Main.MarekPalka
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 41 to 41
 
8 Implement optical link for SCM partly prepared by MB MP, JM
Added:
>
>

TOF systems

Prio. Topic Status Person
5 Downscaling of the headers and trailers from the TDCs (reducing the amount of the data from this systems) not started MP
 

Cables & Installation

Prio. Topic Status Person
Revision 3
24 Sep 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Line: 28 to 28
 

TrbNet

Prio. Topic Status Person
Changed:
<
<
6 Implement & test LVL1 handler prepared, under test GK
>
>
7 Implement & test LVL1 handler prepared, under test GK
 
9 Finish implementing retransmission feature testing JM
5 Prepare including a second TRB for slow control purposes not started JM
Changed:
<
<
>
>
5 Solve Gbe errors (frame buffer full, no link)   GK
5 Compress unnecessary headers in hub   JM
5 Compress MDC data   JM
 

CTS

Revision 2
23 Sep 2010 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgrade"

Short term To-Do List DAQ

Documentation

Changed:
<
<
Topic Status Person
In-depth documentation of CTS settings & behaviour not started  
Write documentation for CTS monitors not started  
Document TOF / RPC / Start / FW read-out not started  
Documentation of Baseline Restorer Board Configuration partly done, some rework needed  
>
>
Prio. Topic Status Person
5 In-depth documentation of CTS settings & behaviour not started  
4 Write documentation for CTS monitors not started  
5 Document TOF / RPC / Start / FW read-out not started  
5 Documentation of Baseline Restorer Board Configuration partly done, some rework needed  
 

Monitoring

Changed:
<
<
Topic Status Person
Show error messages from trbcmd in daqop not started  
Solve segmentation fault errors in daqop monitors not started  
Update daqop monitor to show new CTS registers not started  
Implement multi-threading in all Perl based monitors not started  
>
>
Prio. Topic Status Person
7 Show error messages from trbcmd in daqop not started  
7 Solve segmentation fault errors in daqop monitors not started  
7 Update daqop monitor to show new CTS registers not started  
5 Implement multi-threading in all Perl based monitors not started  
 

Software

Changed:
<
<
Topic Status Person
Investigate discarded events problem in EB above approx. 5 kHz & discarded 0x9 type events   SY
Improve speed of start-up sequence    
>
>
Prio. Topic Status Person
7 Investigate discarded events problem in EB above approx. 5 kHz & discarded 0x9 type events   SY
5 Improve speed of start-up sequence    
 

TrbNet

Changed:
<
<
Topic Status Person
Implement & test LVL1 handler prepared, under test GK
Finish implementing retransmission feature testing JM
Prepare including a second TRB for slow control purposes not started JM
>
>
Prio. Topic Status Person
6 Implement & test LVL1 handler prepared, under test GK
9 Finish implementing retransmission feature testing JM
5 Prepare including a second TRB for slow control purposes not started JM
 

CTS

Changed:
<
<
Topic Status Person
Implement optical link for SCM partly prepared by MB MP, JM
>
>
Prio. Topic Status Person
8 Implement optical link for SCM partly prepared by MB MP, JM
 

Cables & Installation

Changed:
<
<
Topic Status Person
Exchanges trigger cables between TOF & FanPW with shielded ones not started  
>
>
Prio. Topic Status Person
5 Exchanges trigger cables between TOF & FanPW with shielded ones not started  
 

Long term To-Do List DAQ

Changed:
<
<
Topic Status Person
Reduce busy times for pp run    
Reduce start-up times for optical links    
Improve pipelining in GbE interface (>50MB/s)    
>
>
Prio. Topic Status Person
5 Reduce busy times for pp run    
5 Reduce start-up times for optical links    
5 Improve pipelining in GbE interface (>50MB/s)    
 

 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Hades Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)