Mounting new Cables and OEP to MDC

In this file you can find all information you need before working on the MDC upgrade:
Revision 10
15 Oct 2009 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"
Added:
>
>

Mounting new Cables and OEP to MDC

In this file you can find all information you need before working on the MDC upgrade: READ IT!
 

MDC OEP - Mounting

OEP
OEP
Line: 65 to 73
 
META FILEATTACHMENT attr="" comment="OEP" date="1240555009" name="OEP.JPG" path="OEP.JPG" size="65097" user="KathrinGoebel" version="1.1"
META FILEATTACHMENT attr="" comment="CMSStecker" date="1240555033" name="CMSStecker.jpg" path="CMSStecker.jpg" size="16697" user="KathrinGoebel" version="1.1"
META FILEATTACHMENT attr="" comment="CMS" date="1240555055" name="CMSkomplett.jpg" path="CMSkomplett.jpg" size="40141" user="KathrinGoebel" version="1.1"
Added:
>
>
META FILEATTACHMENT attr="" comment="INFORMATION FOR MOUNTING NEW CABLES AND OEP ON MDC" date="1255634215" name="MboDboOnChamber.pdf" path="MboDboOnChamber.pdf" size="3678757" user="JanMichel" version="1.1"
Revision 9
30 Sep 2009 - Main.JanMichel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Line: 25 to 25
 
  • Keep trigger away from FEE because of possible electrical coupling.
    • And if possible from FPC cables! (JW 17.4.2009)
Deleted:
<
<

To Do

 
Changed:
<
<
  • Schedule for work that has to be done!
>
>

While mounting OEPs

  • A list containing all serial numbers has to be maintained, unfortunately the database is neither up-to-date nor complete. A form to write down all necessary information will be prepared (Kathrin?).
    • serial number of OEP
    • serial number of Motherboard
    • serial number of all 4 / 6 daughterboards
  • Please check especially the serial number of the OEP twice since it is vital for the readout system - inconsistencies will prevent DAQ from starting up properly.
 
Deleted:
<
<
  • Trigger cabling is missing on one side of the chamber being prepared for tests.
 
Changed:
<
<
  • Front side of the chamber has to be equipped.
>
>

To Do

  • White optical cables will be replaced by black ones on test chamber.
 
Changed:
<
<
  • New optical fibres have arrived. Old ones will have to be replaced after the tests.
>
>
  • OEP: Power of each channel has to be checked and adjusted (6 channels per MB plus spare channels, 2520 in total)
    • Correct settings can easily be found by using the oep_voltages command to read voltages on all connected OEPs.
 
Deleted:
<
<
  • Pipe for optical fibres will be needed with a diameter of at least 2cm. As an alternative Torsten is preparing a connector for each chamber that collects the optical fibres. One would have to disconnect this connector in order to be able to move the chamber into service position. No long fibres would be needed.
 
Deleted:
<
<
  • OEP: Power of each channel has to be checked and adjusted. (about 2000 channels) Also one has to find out whether there is a power loss due to long power cables.
 

Open questions

Line: 49 to 54
 
  • How long should the cables be?
    • The front side of the chamber remains to be equipped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
      • For the test system the optical fibres should be long enough, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
Changed:
<
<
      • Ergo: all POF lengths given by the position of the test TRB setup, for the final setup POFs will be replaced (or cut and glued to a special connector, being under investigation by Thorsten Heinz).
>
>
      • Ergo: all POF lengths given by the position of the test TRB setup, for the final setup POFs will be glued to a special connector
 
    • Servicepositions of the outer chambers (does not apply to innerchambers with cables chains): 2 solutions are presently discussed:
      • Long POFs and hence introducing loops: this will add approx. 4 m to the total POF cable length, the POFs should be grouped and covered with protection pipes, such as Example Protection Pipe. In Measuring position these loops should be secured (fixed to the mainframem additional cover).
      • POF conncectors: under investigation by Thorsten. If reliable, this would be the optimum solution!
Revision 8
28 Apr 2009 - Main.ChristianMuentz
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Changed:
<
<
  • OEP:
    OEP
>
>
OEP
OEP
 

Connections/Cabling:

Line: 12 to 10
 
    • Connector is keyed, it can only be connected one way! (JW 17.4.2009)
    • Nevertheless important for those people who put together cables and connector! (KG 24.04.2009)
Changed:
<
<
  • Common Stop: distributed to the OEP. White cable is ground, coloured cable is directed to the center of the OEP.
>
>
  • Common Stop:
    • distributed to the OEP. White cable is ground, coloured cable is directed to the center of the OEP.
    • CMS cable (complete)
 

  • Data optical: fibre optics connected.
Changed:
<
<

  • CMS connector (April, 17th) CMSStecker
>
>
  • CMS connector (April, 17th) CMS connector
 

Important

Line: 44 to 40
 

  • OEP: Power of each channel has to be checked and adjusted. (about 2000 channels) Also one has to find out whether there is a power loss due to long power cables.
Deleted:
<
<
 

Open questions

Changed:
<
<
  • Is it important in which way the two optical fibres are connected?
>
>
  • Is it important in which way the two optical fibres are connected?
 
    • No, it can alway's be turned around at the TRB side. The OEP defines wich line is which direction of the connection (JW, 17.4.2009)
      • As Joern suggests we should use and keep this convention: the cable we are going to use are black (2 black wires, Tx-Rx) and they are not marked. Once the FEE is turned ON one can see from the POF (the red light emitted) which line is Tx and which is Rx. Then one can plug the POF in the MDC-Addon accordingly. (A.T. 20.04.2009)
Changed:
<
<
  • How long should the cables be? The front side of the chamber will be equipped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
>
>
  • How long should the cables be?
    • The front side of the chamber remains to be equipped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
 
    • For the test system the optical fibres should be long enough, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
Added:
>
>
      • Ergo: all POF lengths given by the position of the test TRB setup, for the final setup POFs will be replaced (or cut and glued to a special connector, being under investigation by Thorsten Heinz).
    • Servicepositions of the outer chambers (does not apply to innerchambers with cables chains): 2 solutions are presently discussed:
      • Long POFs and hence introducing loops: this will add approx. 4 m to the total POF cable length, the POFs should be grouped and covered with protection pipes, such as Example Protection Pipe. In Measuring position these loops should be secured (fixed to the mainframem additional cover).
      • POF conncectors: under investigation by Thorsten. If reliable, this would be the optimum solution!
 

-- KathrinGoebel - 24 Apr 2009
Changed:
<
<

  • CMS cable:
    CMS
>
>
-- ChristianMuentz - 28 Apr 2009
 

META FILEATTACHMENT attr="" comment="OEP" date="1240555009" name="OEP.JPG" path="OEP.JPG" size="65097" user="KathrinGoebel" version="1.1"
META FILEATTACHMENT attr="" comment="CMSStecker" date="1240555033" name="CMSStecker.jpg" path="CMSStecker.jpg" size="16697" user="KathrinGoebel" version="1.1"
Revision 7
24 Apr 2009 - Main.KathrinGoebel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Line: 54 to 54
 
  • How long should the cables be? The front side of the chamber will be equipped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
    • For the test system the optical fibres should be long enough, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
Changed:
<
<
-- KathrinGoebel - 17 Apr 2009
>
>
-- KathrinGoebel - 24 Apr 2009
 

  • CMS cable:
Revision 6
24 Apr 2009 - Main.KathrinGoebel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Line: 7 to 7
 

Connections/Cabling:

Added:
>
>
 
  • Power cable is marked with dark line that has to be connected in that way that the line is directed to the center of the OEP.
    • Connector is keyed, it can only be connected one way! (JW 17.4.2009)
Added:
>
>
    • Nevertheless important for those people who put together cables and connector! (KG 24.04.2009)
 
  • Common Stop: distributed to the OEP. White cable is ground, coloured cable is directed to the center of the OEP.
Added:
>
>
 
  • Data optical: fibre optics connected.
Added:
>
>
 
  • CMS connector (April, 17th) CMSStecker
Line: 23 to 30
 

To Do

Added:
>
>

  • Schedule for work that has to be done!
 
  • Trigger cabling is missing on one side of the chamber being prepared for tests.
Added:
>
>
 
  • Front side of the chamber has to be equipped.
Added:
>
>
 
  • New optical fibres have arrived. Old ones will have to be replaced after the tests.
Added:
>
>
 
  • Pipe for optical fibres will be needed with a diameter of at least 2cm.
Added:
>
>
As an alternative Torsten is preparing a connector for each chamber that collects the optical fibres. One would have to disconnect this connector in order to be able to move the chamber into service position. No long fibres would be needed.

  • OEP: Power of each channel has to be checked and adjusted. (about 2000 channels) Also one has to find out whether there is a power loss due to long power cables.
 

Open questions

Revision 5
24 Apr 2009 - Main.KathrinGoebel
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Changed:
<
<
Picture of the OEP
>
>
  • OEP:
    OEP
 

Connections/Cabling:

  • Power cable is marked with dark line that has to be connected in that way that the line is directed to the center of the OEP.
Line: 10 to 12
 
  • Common Stop: distributed to the OEP. White cable is ground, coloured cable is directed to the center of the OEP.
  • Data optical: fibre optics connected.
Added:
>
>
  • CMS connector (April, 17th) CMSStecker
 

Important

  • The sector being equiped with the new readout has to be covered with the protection plates (not metal for the outer chambers)! (Eventually these plates have to be adjusted)
Line: 33 to 38
 

-- KathrinGoebel - 17 Apr 2009
Added:
>
>

  • CMS cable:
    CMS

META FILEATTACHMENT attr="" comment="OEP" date="1240555009" name="OEP.JPG" path="OEP.JPG" size="65097" user="KathrinGoebel" version="1.1"
META FILEATTACHMENT attr="" comment="CMSStecker" date="1240555033" name="CMSStecker.jpg" path="CMSStecker.jpg" size="16697" user="KathrinGoebel" version="1.1"
META FILEATTACHMENT attr="" comment="CMS" date="1240555055" name="CMSkomplett.jpg" path="CMSkomplett.jpg" size="40141" user="KathrinGoebel" version="1.1"
Revision 4
21 Apr 2009 - Main.MichaelTraxler
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Line: 12 to 12
 

Important

Changed:
<
<
  • The sector being equiped with the new readout has to be covered with the metal plates! (Eventually these plates have to be adjusted)
>
>
  • The sector being equiped with the new readout has to be covered with the protection plates (not metal for the outer chambers)! (Eventually these plates have to be adjusted)
 
  • Keep trigger away from FEE because of possible electrical coupling.
    • And if possible from FPC cables! (JW 17.4.2009)

To Do

  • Trigger cabling is missing on one side of the chamber being prepared for tests.
Changed:
<
<
  • Front side of the chamber has to be equiped.
>
>
  • Front side of the chamber has to be equipped.
 
  • New optical fibres have arrived. Old ones will have to be replaced after the tests.
  • Pipe for optical fibres will be needed with a diameter of at least 2cm.
Line: 28 to 28
 
  • Is it important in which way the two optical fibres are connected?
    • No, it can alway's be turned around at the TRB side. The OEP defines wich line is which direction of the connection (JW, 17.4.2009)
      • As Joern suggests we should use and keep this convention: the cable we are going to use are black (2 black wires, Tx-Rx) and they are not marked. Once the FEE is turned ON one can see from the POF (the red light emitted) which line is Tx and which is Rx. Then one can plug the POF in the MDC-Addon accordingly. (A.T. 20.04.2009)
Changed:
<
<
  • How long should the cables be? The front side of the chamber will be equiped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
    • For the test system the optical fibres should be long enought, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
>
>
  • How long should the cables be? The front side of the chamber will be equipped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
    • For the test system the optical fibres should be long enough, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
 

-- KathrinGoebel - 17 Apr 2009
Revision 3
20 Apr 2009 - Main.AttilioTarantola
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Line: 27 to 27
 

Open questions

  • Is it important in which way the two optical fibres are connected?
    • No, it can alway's be turned around at the TRB side. The OEP defines wich line is which direction of the connection (JW, 17.4.2009)
Added:
>
>
      • As Joern suggests we should use and keep this convention: the cable we are going to use are black (2 black wires, Tx-Rx) and they are not marked. Once the FEE is turned ON one can see from the POF (the red light emitted) which line is Tx and which is Rx. Then one can plug the POF in the MDC-Addon accordingly. (A.T. 20.04.2009)
 
  • How long should the cables be? The front side of the chamber will be equiped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
    • For the test system the optical fibres should be long enought, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
Revision 2
17 Apr 2009 - Main.JoernWuestenfeld
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"

MDC OEP - Mounting

Line: 6 to 6
 

Connections/Cabling:

  • Power cable is marked with dark line that has to be connected in that way that the line is directed to the center of the OEP.
Added:
>
>
    • Connector is keyed, it can only be connected one way! (JW 17.4.2009)
 
  • Common Stop: distributed to the OEP. White cable is ground, coloured cable is directed to the center of the OEP.
  • Data optical: fibre optics connected.
Line: 13 to 14
 

Important

  • The sector being equiped with the new readout has to be covered with the metal plates! (Eventually these plates have to be adjusted)
  • Keep trigger away from FEE because of possible electrical coupling.
Added:
>
>
    • And if possible from FPC cables! (JW 17.4.2009)
 

To Do

Line: 24 to 26
 

Open questions

  • Is it important in which way the two optical fibres are connected?
Added:
>
>
    • No, it can alway's be turned around at the TRB side. The OEP defines wich line is which direction of the connection (JW, 17.4.2009)
 
  • How long should the cables be? The front side of the chamber will be equiped with the new optical fibres - should they be short or should one be able to later connect them to the readout?
Changed:
<
<

>
>
    • For the test system the optical fibres should be long enought, to place the TRB below the chamber between the rails of the mainframe. Once they get replaced, they need to be long enough, to be connected to the readout at the final position. Which is for the outer chambers in the mainframe (if seen in beam direction, front frame left and right lower corner of yellow frame), for the inner ones below the front platforms. (JW, 17.4.2009)
 

-- KathrinGoebel - 17 Apr 2009
 