Difference: RossendorfDec07Minutes (1 vs. 5)

Revision 5
26 Oct 2009 - Main.JanMichel
Line: 1 to 1
Changed:
<
<
META TOPICPARENT name="DaqUpgradeMDCOverview"
>
>
META TOPICPARENT name="MDCUpgradeOld"
  -- BurkhardKolb - 14 Dec 2007

Agenda:

11.12.07
Revision 4
20 Dec 2007 - Main.ChristianMuentz
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"
-- BurkhardKolb - 14 Dec 2007

Agenda:

Line: 65 to 65
 

C.M. report about HV-Filterbox

  • proposal to build new boxes with signal output for cathode wires (LVL1 trigger). 13 boxes are needed to test on one chamber with Sergey Ch. the modified amplifier board. K.H. will build them up to end of Jan. Cable length needed. See below:
  • new-HV-Filter.pdf: HV Filter: schematics and cable lengths
Added:
>
>
 

META FILEATTACHMENT attr="" comment="HV Filter: schematics and cable lengths" date="1197985446" name="new-HV-Filter.pdf" path="new-HV-Filter.pdf" size="37655" user="ChristianMuentz" version="1.1"
Added:
>
>
META FILEATTACHMENT attr="" comment="K. Heidels reply" date="1198155229" name="HVFilteFZR12-2007.txt" path="HV Filte FZR 12-2007.txt" size="1005" user="ChristianMuentz" version="1.3"
Revision 3
18 Dec 2007 - Main.ChristianMuentz
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"
Deleted:
<
<
  -- BurkhardKolb - 14 Dec 2007

Agenda:

11.12.07
Line: 64 to 63
 
  • A.T. will make a test measurement with cable from layer 1 and a layer 3 as comparison, noise, test pulser. J.W. and K.H. will come to GSI after 7th of Jan for this test.

C.M. report about HV-Filterbox

Changed:
<
<
  • proposal to build new boxes with signal output for cathode wires (LVL1 trigger). 13 boxes are needed to test on one chamber with Sergey Ch. the modified amplifier board. K.H. will build them up to end of Jan. Cable length needed.
>
>
  • proposal to build new boxes with signal output for cathode wires (LVL1 trigger). 13 boxes are needed to test on one chamber with Sergey Ch. the modified amplifier board. K.H. will build them up to end of Jan. Cable length needed. See below:
  • new-HV-Filter.pdf: HV Filter: schematics and cable lengths
 
Added:
>
>
META FILEATTACHMENT attr="" comment="HV Filter: schematics and cable lengths" date="1197985446" name="new-HV-Filter.pdf" path="new-HV-Filter.pdf" size="37655" user="ChristianMuentz" version="1.1"
Revision 2
17 Dec 2007 - Main.BurkhardKolb
Line: 1 to 1
 
META TOPICPARENT name="DaqUpgradeMDCOverview"
Deleted:
<
<
  -- BurkhardKolb - 14 Dec 2007

Agenda:

11.12.07
Line: 27 to 26
 

unpacker, data format J.W.

  • MBOno in data word
Added:
>
>

Eventbuilding J.M. + I.F.

  • Eventbuilding in MBO order?
 

preparation of "roc and cal files" J.W.

Other to do items:

 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Hades Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)