Not the official milestones, but some pragmatic steps:

Simulations

VHDL simulation done by Ingo. First important step is to have a running chain with 2 dummy APLs sending, the complete IOBUFs in between, and the lvds link written by Jan Michel. Simulation seems to be OK (2.3.2007): LVDS is running with 25MHz (slow interface)

* lvds chain:
lvds chain -- IngoFroehlich - 14 Feb 2006

Tests with hardware

07.05.2007: The communication between the acromag and the TRB test board is running stable now. The acromag contains a simple APL that sends data (it counts from 0 to 5) to the TRB which acknowledges and answers each transfer. Both FPGA are running at 100 MHz while the LVDS transfer has a clock of 25 MHz. trb hardware test -- JanMichel - 07 May 2007

16 Bit

16.10.2007: 16 bit version of the network almost finished. A first test of the new entities in hardware has been done. A sample transfer on a 8Bit LVDS cable with trb_net16:

A sample transfer on a 8Bit LVDS cable with trb_net16

-- JanMichel - 25 Oct 2007

Tests on the optical link and TLK1501

  • Done by M. Palka

Loopback test on the AcromagModule

  • Get first communication with the acromag design running
  • Make a hub base design
  • Connect the modules to a loopback device:
    loopback
  • Test interrupts
  • Implement software DTU
  • Make connection from DTU to software TIP

Connection with the TRB-test board

The TRB test board will have 2 optical links, one SCSI link to connect the AcromagModule and might serve as an old-to-new converter. In this sense, it is a TRB-Net-Hub

Topic revision: r8 - 22 Dec 2008, JanMichel
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Hades Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)