Logbook

Installation: INNER planes

Task Plane 1/2 Sector 1 Plane 1/2 Sector 2 Plane 1/2 Sector 3 Plane 1/2 Sector 4 Plane 1/2 Sector 5 Plane 1/2 Sector 6
Threshold test            
Calibration test            
Check Low Voltage Connectors on FANPV            
Check Low Voltage Connectors on OEPB            
Check connections between OEPB and MB            

Installation: OUTER planes

TaskSorted ascending Plane 3/4 Sector 1 Plane 3/4 Sector 2 Plane 3/4 Sector 3 Plane 3/4 Sector 4 Plane 3/4 Sector 5 Plane 3/4 Sector 6
Calibration test   14-18 Feb        
Check connections between OEPB and MB            
Check Low Voltage Connectors on FANPV            
Check Low Voltage Connectors on OEPB            
Threshold test   14-18 Feb        

Empty space: not yet done; Brown: temporarily done; Green: finished

-- AttilioTarantola - 04 Feb 2011
Topic revision: r2 - 11 Feb 2011, AttilioTarantola
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Hades Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)