MDC Upgrade

Installation

Task Plane 1 Plane 2 Plane 3/4 Sector 1 Plane 3/4 Sector 2 Plane 3/4 Sector 3 Plane 3/4 Sector 4 Plane 3/4 Sector 5 Plane 3/4 Sector 6
Low Voltage Cable from switchbox to chamber
 
 
2009-09
2009-09
2009-09
2009-09
2009-09
2009-09
Low Voltage Connectors
 
 
in mainframe
2009-12
2009-12
2009-09
one side
2009-10-15
Optical Fibres in mainframe
 
 
2009-09
2009-09
2009-09
2009-09
2009-09
2009-09
Optical Fibres - cut ends to addon properly
 
 
2009-10-07
2009-10-12
2009-11-03
2009-09
2009-10-09
2009-10-07
Optical Fibres - cut ends in mainframe properly
 
 
2009-12-11
2009-11-04
2009-11-03
2009-09
2009-10-09
2009-10-07
Optical Fibres - numbering addon side
 
 
2009-12-11
2009-11-04
2009-11-03
2009-09
2009-10-09
2009-10-07
Optical Fibres - numbering mainframe side
 
 
2009-12-11
2009-11-04
2009-11-03
2009-09-25
2009-10-09
2009-10-07
Optical Fibres - connector in mainframe
 
 
2009-12
2009-12
2009-12
2009-10-14
2009-12
2009-11-02
Chamber equipped with optical fibres
 
long sides
 
two sides
two sides
2009-09
2009-10-30
2009-10-14
Chamber equipped with power cables
 
long sides
 
two sides
two sides
2009-09
2009-10-30
2009-10-14
Chamber equipped with trigger cables
 
long sides
 
two sides
two sides
2009-09
2009-10-30
2009-10-14
Chamber equipped optical connector
 
 
 
 
 
2009-10-14
2009-11-02
2009-11-02
Chamber equipped with OEPs
 
2009-12-20
 
2009-12
2009-12
2009-10-12
2009-10-30
2009-10-14
MDC Optical AddOn connected
 
 
 
 
 
2009-09
 
 
MDC Optical AddOn mounting
 
 
 
 
 
 
 
 
Power cables cut
 
long sides
 
2009-10-12
2009-10-12
2009-10-12
2009-10-12
2009-10-09
Power cables tested
 
long sides
 
2009-10-12
2009-10-12
2009-09
2009-10-12
2009-10-12
Optical cables cut
 
long sides
 
2009-10-29
2009-10-09
2009-10-12
2009-10-12
2009-10-09
Replaced CMS connectors
 
2009-12
 
2009-12-10
2009-12-11
2009-12-12
2009-12-13
2009-12-14

Red: Planned time Brown: temporarily done Green: finished

FanPW voltage adjustment

Sector Module Date
0
0
 
0
1
 
0
2
 
0
3
 
1
0
 
1
1
 
1
2
 
1
3
 
2
0
 
2
1
 
2
2
 
2
3
 
3
0
 
3
1
2010-05-05
3
2
 
3
3
 
4
0
 
4
1
 
4
2
 
4
3
 
5
0
 
5
1
 
5
2
 
5
3
 

TRB / AddOn

  • The stacks for TRB / MDC AddOn are built
  • Holding for stacks will be prepared by Andreas until 15.01.

Current Numbers

Item Produced Tested Installed Date
OEP v3 series 1
20
19
0
2009-10-05
OEP v3 series 2
40
25
0
2009-10-09
OEP v3 series 2
81
73
50
2009-10-12
OEP v3 series 2
116
94
82
2009-10-14
OEP v3 series 2
128
112
82
2009-10-15
OEP v3 series 2
193
112
82
2009-10-19
OEP v3 series 2
213
112
82
2009-10-20
OEP v3 series 2
216
182
82
2009-10-23
OEP v3 series 2
216
216
82
2009-10-28
OEP v3 series 2
228
216
102
2009-10-29
OEP v3 series 2
310
216
102
2009-11-02
OEP v3 series 2
338
216
114
2009-11-03
OEP v3 series 2
328
282
124
2009-11-04
OEP v3 series 2
406
286
124
2009-11-05
OEP v3 series 2
440
440
~250
2009-12-01
MDC Optical AddOn v1
5
5
1
2009-10-05
MDC Optical AddOn v2
16
16
12
2010-02-01
Fan PW v2
3
3
1
2009-10-07
Fan PW v3
4
4
--
2009-12-10
Fan PW v3
30
30
--
2010-01-10
Topic revision: r29 - 2010-05-05, JoernWuestenfeld
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki Send feedback | Imprint | Privacy Policy (in German)