HADES Network Configuration in Counting House
Network Switches
After a discussion with Mathias M�nch today (2006-05-18) we can assume the following:
- The maintainance of the Foundry Switch is in the moment regulated by a contract and the contracted-company is obliged to come in a case of a failure in 4 hours with replacement parts.
This contract will be changed in the future, but then there will be replacement switches (48 ports) available in the IT department.
- So, we don't have to worry about a broken switch, the IT department will help in case of a failure and we don't need to buy replacment equipment.
Infos
- Info (2005-09-15): The Netgear-Switch (20 ports) is dropping some UDP packets, so it can not be used for the DAQ!
The current network connections
Since the responsibility for the patching of the network connections in the counting house is with the HADES group, the actual layout should be documented here.
The following tables should be updated whenever a change to the cabling of the connections between the switches Foundry, Netgear and the patch pannels in the network cabinet in the HADES counting house are done.
More info on HADES VLAN
Network Rack Cabling
TH1H - 05C identical to
TH1H - 01C
GIFTX04 Brocade Turbo-Iron 24x
Port |
VLAN |
tag |
comment |
7 |
GSI |
|
lxhadeb01 |
8 |
GSI |
|
lxhadeb02 |
9 |
GSI |
|
lxhadeb03 |
10 |
GSI |
|
lxhadeb04 |
13 |
HADES |
|
lxhadeb01 |
14 |
HADES |
|
lxhadeb02 |
15 |
HADES |
|
lxhadeb03 |
16 |
HADES |
|
lxhadeb04 |
Foundry
This Switch replaces the old GIGE 31 (Avaya) Switch. It has 48 ports and 4 fiber ports on the first 4 ports (tape locked)
Main Module (GIFFWSX24) configuration
todo: check tagging JAM
Port |
Gbps |
VLAN |
tag |
comment |
1F |
1 |
1, 2, 64 |
tagged |
backup uplink to GIFRX80 5/22 |
2F-4F |
1 |
- |
- |
not active |
1 |
1 |
- |
- |
tape locked due to 1F-backup link |
2-7 |
1 |
1000 |
untagged |
HADES VLAN |
8 |
1 |
64 |
untagged |
Acceler VLAN |
9-14 |
1 |
1000 |
untagged |
HADES VLAN |
15 |
1 |
6 |
untagged |
|
16-40 |
1 |
1000 |
untagged |
HADES VLAN |
25-40 |
1 |
1000 |
untagged |
HADES VLAN |
41 |
1 |
1 |
untagged |
GSI WLAN |
42 |
1 |
2 |
tagged |
GSI WLAN (WAP110) |
43-48 |
1 |
1 |
untagged |
GSI VLAN |
49 |
10 |
1, 2, 64, 101 |
tagged |
uplink to GIFRX81 13/3 |
50 |
10 |
1, 1000 |
tagged |
downlink to GIFTX04 |
Main Module (GIFFWSX24), description of connections
Updated table and inserted column for vlan.
--
JoernAdamczewski - 13 Nov 2017
Netgear switches
Netgear #1 (CH downstairs, network rack, first from top)
Netgear #2 (CH downstairs, network rack, second from top)
Netgear #3 (CH downstairs, network rack, third from top)
Netgear #4 (CH downstairs, network rack, fourth from top)
Netgear #5 (Cave, TOF rack)
Other switches
Name |
Place |
Comment |
hadsw01 |
EELab |
Netgear Manageable Switch (can be configured with HADES VLAN IP) |
hadsw02 |
EELab |
Netgear Manageable Switch |
Socket Connections
Places
Sockets |
# |
Places |
comment |
TH1H 01C |
01 - 08 |
CH downstairs |
|
TH1H 01C |
09 - 12 |
--- |
do not exist |
TH1H 01C |
13 - 22 |
CH upstairs |
|
TH1H 05M |
01 - 08 |
CH downstairs |
|
TH1H 05M |
09 - 20 |
CH upstairs |
|
TH1H 05P |
01 - 08 |
RICH tent (cave) |
01C (01-08) -> 05P (01-08) patch panel in network rack |
TH1H 05P |
09 - 16 |
RICH patch panel (cave) |
01C (01-08) -> 05P (09-16) patch panel in network rack |
TH1H 05P |
17 - 24 |
cave |
|
TH1H 05Q |
01 - 04 |
ALICE tent |
|
TH1H 05Q |
05 - 14 |
detector hut |
|
TH1H 05Q |
15 - 24 |
cave |
|
Overview
--
SergeyYurevich - 14 Jul 2009