Task Plane 1 Plane 2 Plane 3/4 Sector 1 Plane 3/4 Sector 2 Plane 3/4 Sector 3 Plane 3/4 Sector 4 Plane 3/4 Sector 5 Plane 3/4 Sector 6
Low Voltage Cable from switchbox to chamber     2009-09 2009-09 2009-09 2009-09 2009-09 2009-09
Low Voltage Connectors     in mainframe 2009-12 2009-12 2009-09 one side 2009-10-15
Optical Fibres in mainframe     2009-09 2009-09 2009-09 2009-09 2009-09 2009-09
Optical Fibres - cut ends to addon properly     2009-10-07 2009-10-12 2009-11-03 2009-09 2009-10-09 2009-10-07
Optical Fibres - cut ends in mainframe properly     2009-12-11 2009-11-04 2009-11-03 2009-09 2009-10-09 2009-10-07
Optical Fibres - numbering addon side     2009-12-11 2009-11-04 2009-11-03 2009-09 2009-10-09 2009-10-07
Optical Fibres - numbering mainframe side     2009-12-11 2009-11-04 2009-11-03 2009-09-25 2009-10-09 2009-10-07
Optical Fibres - connector in mainframe     2009-12 2009-12 2009-12 2009-10-14 2009-12 2009-11-02
Chamber equipped with optical fibres   long sides   two sides two sides 2009-09 2009-10-30 2009-10-14
Chamber equipped with power cables   long sides   two sides two sides 2009-09 2009-10-30 2009-10-14
Chamber equipped with trigger cables   long sides   two sides two sides 2009-09 2009-10-30 2009-10-14
Chamber equipped optical connector           2009-10-14 2009-11-02 2009-11-02
Chamber equipped with OEPs   2009-12-20   2009-12 2009-12 2009-10-12 2009-10-30 2009-10-14
MDC Optical AddOn connected           2009-09    
MDC Optical AddOn mounting        
Power cables cut   long sides   2009-10-12 2009-10-12 2009-10-12 2009-10-12 2009-10-09
Power cables tested   long sides   2009-10-12 2009-10-12 2009-09 2009-10-12 2009-10-12
Optical cables cut   long sides   2009-10-29 2009-10-09 2009-10-12 2009-10-12 2009-10-09
Replaced CMS connectors   2009-12   2009-12-10 2009-12-11 2009-12-12 2009-12-13 2009-12-14

Red: Planned time Brown: temporarily done Green: finished

FanPW voltage adjustment

Sector Module Date
0 0  
0 1  
0 2  
0 3  
1 0  
1 1  
1 2  
1 3  
2 0  
2 1  
2 2  
2 3  
3 0  
3 1 2010-05-05
3 2  
3 3  
4 0  
4 1  
4 2  
4 3  
5 0  
5 1  
5 2  
5 3  

TRB / AddOn

  • The stacks for TRB / MDC AddOn are built
  • Holding for stacks will be prepared by Andreas until 15.01.

Current Numbers

Item Produced Tested Installed Date
OEP v3 series 1 20 19 0 2009-10-05
OEP v3 series 2 40 25 0 2009-10-09
OEP v3 series 2 81 73 50 2009-10-12
OEP v3 series 2 116 94 82 2009-10-14
OEP v3 series 2 128 112 82 2009-10-15
OEP v3 series 2 193 112 82 2009-10-19
OEP v3 series 2 213 112 82 2009-10-20
OEP v3 series 2 216 182 82 2009-10-23
OEP v3 series 2 216 216 82 2009-10-28
OEP v3 series 2 228 216 102 2009-10-29
OEP v3 series 2 310 216 102 2009-11-02
OEP v3 series 2 338 216 114 2009-11-03
OEP v3 series 2 328 282 124 2009-11-04
OEP v3 series 2 406 286 124 2009-11-05
OEP v3 series 2 440 440 ~250 2009-12-01
MDC Optical AddOn v1 5 5 1 2009-10-05
MDC Optical AddOn v2 16 16 12 2010-02-01
Fan PW v2 3 3 1 2009-10-07
Fan PW v3 4 4 -- 2009-12-10
Fan PW v3 30 30 -- 2010-01-10
Topic revision: r29 - 05 May 2010, JoernWuestenfeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Hades Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)